WATER FEEDING PIPE AND PIPING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a piping construction method capable of simply adjusting an amount of water temporarily accumulated between an upstream side equipment water supply source and downstream side terminal equipment.SOLUTION: A piping construction method is for connecting between a water...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a piping construction method capable of simply adjusting an amount of water temporarily accumulated between an upstream side equipment water supply source and downstream side terminal equipment.SOLUTION: A piping construction method is for connecting between a water heater 4 and a shower facility 6 with a pipe 8 for hot water supply. The piping construction method comprises inserting a flexible small-diameter pipe 11 into the pipe 8 for hot water supply from a connection portion between the pipe 8 for hot water supply and the water heater 4 or shower facility 6, to perform adjustment of reducing internal volume of the pipe 8 for hot water supply.SELECTED DRAWING: Figure 1
【課題】 上流側機器給水源と下流側末端機器との間に停留する水の量を簡単に調節可能な配管施工方法を提供すること。【解決手段】 給湯器4とシャワー設備6との間を給湯用パイプ8で接続するための配管施工方法であって、給湯用パイプ8と給湯器4又はシャワー設備6との接続部分から、給湯用パイプ8の内部に可撓性のある小径パイプ11を挿入配置することで、給湯用パイプ8の内容積を減少させる調節を行う。【選択図】 図1 |
---|