SWITCH OPERATION DEVICE AND POWER WINDOW CONTROL DEVICE

PROBLEM TO BE SOLVED: To provide a switch operation device 1 capable of preventing erroneous detection of a signal level when water leakage or the like occurs.SOLUTION: A switch operation device 1 includes: an output part P2 for outputting a switch signal: five electric paths EP1 to EP5 which are co...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KIYONO KENICHI, MICHIHIRA OSAMU, SAKURA YUSUKE
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a switch operation device 1 capable of preventing erroneous detection of a signal level when water leakage or the like occurs.SOLUTION: A switch operation device 1 includes: an output part P2 for outputting a switch signal: five electric paths EP1 to EP5 which are connected to the output part P2 and alternatively energized; and a submergence-time control circuit 12 which is operated during submersion of the switch operation device 1 to disconnect the electric path EP3 as a control target electric path. The electric path EP3 includes a resistor R1, a resistor R2 and a switch S3 which are connected in series.SELECTED DRAWING: Figure 1C 【課題】水濡れ等が発生した場合における信号レベルの誤検出を防止できるスイッチ操作装置1を提供すること。【解決手段】スイッチ操作装置1は、スイッチ信号を出力する出力部P2と、出力部P2に接続され且つ択一的に通電される5つの電路EP1〜EP5と、スイッチ操作装置1の水没の際に作動して制御対象電路としての電路EP3を遮断する水没時制御回路12とを備える。電路EP3は、直列接続された抵抗器R1と抵抗器R2とスイッチS3とを含む。【選択図】図1C