LOAD DISTRIBUTION DEVICE AND METHOD FOR THERMAL POWER GENERATION SYSTEM
PROBLEM TO BE SOLVED: To provide a power generation plan amendment capable of avoiding band constraint violation on the basis of a power generation draft plan of the whole thermal power generation system.SOLUTION: A load distribution device 1 for a thermal power generation plant constituted by a plu...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a power generation plan amendment capable of avoiding band constraint violation on the basis of a power generation draft plan of the whole thermal power generation system.SOLUTION: A load distribution device 1 for a thermal power generation plant constituted by a plurality of sets of thermal power generation units comprises: a power generation plan processing section for acquiring an individual power generation plan for each thermal power generation unit from a total power generation plan; output band calculation means for calculating power generation upper and lower limits in an output band using the individual power generation plan for each thermal power generation unit and information stored in a band constraint database; and power generation plan creation means for calculating a thermal power generation unit output distribution for implementing a power generation plan for summation of the thermal power generation units while taking output of the output band calculation means as a constraint condition. The load distribution device further comprises output means for selecting an output band for avoiding violation when the violation is detected by band constraint determination means and outputting output upper and lower limits in the output band to the power generation plan creation means.SELECTED DRAWING: Figure 1
【課題】火力発電システム全体の発電計画案に基づき、バンド制約違反を回避できる発電計画補正案を提供する。【解決手段】複数組で構成された火力発電プラントの負荷配分装置1であって、合計発電計画から火力発電ユニットごとの個別発電計画を求める発電計画処理部と、各火力発電ユニットの個別発電計画と、バンド制約データベースに記憶した情報を用いて、当該出力バンドでの発電上下限値を算出する出力バンド演算手段と、出力バンド演算手段の出力を制約条件として火力発電ユニット合計での発電計画を実現するための火力発電ユニット出力配分を演算する発電計画立案手段を備える。さらに、バンド制約判定手段により違反が検出された場合には、違反を回避する出力バンドを選定して、当該出力バンドでの出力上下限値を発電計画立案手段に出力する出力手段とを備える。【選択図】図1 |
---|