STACKING DEVICE AND STACKING METHOD
PROBLEM TO BE SOLVED: To be able to secure a work area in the space and to allow temporary placement of multiple elongated materials in the space, even if the space around the building under construction is narrow at the height of the ground.SOLUTION: A stacking device includes a guide post 41A erec...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To be able to secure a work area in the space and to allow temporary placement of multiple elongated materials in the space, even if the space around the building under construction is narrow at the height of the ground.SOLUTION: A stacking device includes a guide post 41A erected on a side of a building frame 1 under construction, a plurality of suspending jigs 51A provided on the guide post 41A so as to horizontally extend from the guide post 41A and vertically guided by the guide post 41A and vertically arranged, a pair of flexible wires 54A connected between upper and lower adjacent ones of the plurality of suspending jigs 51A, and a lifting device 32A that raises and lowers the uppermost suspending jig 51A. A long material 90 passed between the upper and lower adjacent pairs of the suspending jig 51A and between the pair of flexible wires 54A is raised and lowered together with the suspending jig 51A by the lifting device 32A.SELECTED DRAWING: Figure 1
【課題】地上の高さにおいて建設中の建築物の周囲のスペースが狭くても、そのスペースに作業領域を確保できるようにするとともに、そのスペースに複数の長尺材を仮置きできるようにする。【解決手段】段積み装置は、建設中の建築物の躯体1の脇に立設されたガイド支柱41Aと、ガイド支柱41Aから水平に延出するようガイド支柱41Aに設けられ、ガイド支柱41Aによって上下に案内され、上下に配列された複数の吊り治具51Aと、複数の吊り治具51Aの上下隣り同士の間に連結した対の可撓性線材54Aと、最上段の吊り治具51Aを昇降させる揚重機器32Aと、を備える。吊り治具51Aの上下隣り同士の間且つ対の可撓性線材54Aの間に通された長尺材90を吊り治具51Aとともに揚重機器32Aで昇降させる。【選択図】図1 |
---|