MATERIAL FITTING UNIT FOR WIRING BYPASS CONSTRUCTION, AND CARRIAGE FOR CARRYING MATERIAL FITTING UNIT FOR WIRING BYPASS CONSTRUCTION
PROBLEM TO BE SOLVED: To provide a material fitting unit for wiring bypass construction which facilitates work from transportation of a switch for construction to fitting in bypass construction of wiring, and is capable of implementing the work from the transportation of the switch for construction...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a material fitting unit for wiring bypass construction which facilitates work from transportation of a switch for construction to fitting in bypass construction of wiring, and is capable of implementing the work from the transportation of the switch for construction to the fitting even in the case of a single worker, and used for wire replacing construction or the like on an electric pole to which the switch for construction and a bypass cable are integrally fitted, and a carriage for carrying the unit.SOLUTION: The present invention relates to a material fitting unit for wiring bypass construction and a carriage. The material fitting unit for wiring bypass construction is used for wire replacing construction or the like on an electric pole. The material fitting unit for wiring bypass construction comprises a first pipe and a second pipe. A switch for construction is fitted to the first pipe, and the second pipe is supported by the first pipe. Fixing metal fittings to an electric pole are provided at both ends of the second pipe, and a bypass cable winding part is fitted to the second pipe. The carriage comprises: a base; a receiving part for receiving a connection rod that protrudes in a Z-axis direction, into the base in a freely removable manner; and a strut supporting the second pipe.SELECTED DRAWING: Figure 6
【課題】架線のバイパス工法において、工事用開閉器の輸送から取り付けまでの作業を容易にし、作業者が一人の場合であっても工事用開閉器の輸送から取り付けまでの作業を実施できる、工事用開閉器とバイパスケーブルが一体的に取付けられる電柱での電線張替え工事等に使用される架線バイパス工事用資材取り付けユニット及び該ユニットを運搬するための台車を提供する。【解決手段】第1パイプと第2パイプとを備え、第1パイプには工事用開閉器が取付けられ、第2パイプは第1パイプに支持され、第2パイプの両端部には電柱への固定用金具が設けられ、第2パイプにはバイパスケーブル巻取り部が取り付けられてなる電柱での電線張替え工事等に使用される架線バイパス工事用資材取り付けユニット及び基部と基部にZ軸方向に突出した接続ロッドを着脱自在に受け入れる受入部と第2パイプを支持する支柱とを備えてなる台車。【選択図】図6 |
---|