LIQUEFACTION PREVENTION AND MAINTENANCE METHOD FOR EXISTING BANKING
PROBLEM TO BE SOLVED: To provide a liquefaction prevention and maintenance method for an existing banking with reinforced integrity of non-liquefaction integral structure that suppresses deformation on an outer periphery of an existing banking on a foundation ground, even when the foundation ground...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a liquefaction prevention and maintenance method for an existing banking with reinforced integrity of non-liquefaction integral structure that suppresses deformation on an outer periphery of an existing banking on a foundation ground, even when the foundation ground is liquefied at a time of earthquake.SOLUTION: A liquefaction prevention and maintenance method for an existing banking 110 includes: a slope toe part removal step for removing a slope toe part 111 of the existing banking 110 erected on top of a foundation ground B; a foundation ground excavation step underneath the slope toe for forming an excavated region A3 underneath the slope toe part 111 and an outer periphery of the slope toe part 111; a non-liquefaction integral structure installation step for installing a non-liquefaction integral structure 120 comprising crushed stones 121, 123 and a reinforcing sheet 122, in the excavated region A3; and a banking collapse suppression weight installation step for installing a banking collapse suppression weight 130 comprising a gabion 132, a cobblestone 133 and a covering fill 134, on top of the non-liquefaction integral structure 120. The reinforcing sheet 123 is made of a sheet-form geosynthetics or a wire net.SELECTED DRAWING: Figure 14
【課題】地震の際に基礎地盤が液状化を起こす場合であっても基礎地盤上の既設盛土における外縁の変形を抑制する非液状化一体構造体の一体性を強化した既設盛土の液状化対策メンテナンス工法を提供すること。【解決手段】基礎地盤Bの上方に造成された既設盛土110の法尻部111を撤去する法尻部撤去工程と、法尻部111とこの法尻部111の外縁との下方に掘削領域A3を形成する法尻下方基礎地盤掘削工程と、掘削領域A3に砕石121、123と補強シート122とからなる非液状化一体構造体120を設置する非液状化一体構造体設置工程と、非液状化一体構造体120の上方にふとん籠132と栗石133と押え盛土134とからなる盛土崩れ抑止重し130を設置する盛土崩れ抑止重し設置工程とを備え、補強シート123が、シート状のジオシンセティックスまたは金網からなること既設盛土110の液状化対策メンテナンス工法。【選択図】図14 |
---|