MANUFACTURING FACILITY OF PIPE COMPONENT

PROBLEM TO BE SOLVED: To properly arrange a work area for manufacturing a pipe component in an internal space of one box body without impairing workability.SOLUTION: A brazing area (30), an airtightness test area (40), and a finishing area (50) are arranged into a line along a first side wall (21) o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHIGENAGA YUKIO, SHIOTSUKI SATOSHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To properly arrange a work area for manufacturing a pipe component in an internal space of one box body without impairing workability.SOLUTION: A brazing area (30), an airtightness test area (40), and a finishing area (50) are arranged into a line along a first side wall (21) of a box body (20) within the one box body (20) attached to a chassis (202) of a trailer (201). In the brazing area (30), work of brazing multiple members to manufacture a semi-product is conducted. In the airtightness test area (40), an airtightness test of the semi-product is conducted. In the finishing area (50), a work of covering the semi-product with a heat insulation material to finish a pipe component is conducted.SELECTED DRAWING: Figure 3 【課題】配管部品を製造するための作業エリアを、作業性を損なうこと無く、一つの箱体の内部空間に適切に配置する。【解決手段】トレーラ(201)の車台(202)に取り付けられる一つの箱体(20)の内部に、ロウ付けエリア(30)と気密試験エリア(40)と仕上げエリア(50)とを、箱体(20)の第1側壁(21)に沿って一列に配置する。ロウ付けエリア(30)では、複数の部材をロウ付けによって接合して半製品を製作する作業が行われる。気密試験エリア(40)では、半製品の気密性の試験が行われる。仕上げエリア(50)では、半製品を断熱材で覆って配管部品を完成させる作業が行われる。【選択図】図3