CONSTRUCTION METHOD OF FLOOR SLAB AND JOINT STRUCTURE OF PCa FLOOR SLAB

PROBLEM TO BE SOLVED: To provide a construction method of a floor slab and a joint structure of a PCa floor slab capable of reducing arranging-binding work at a job site of a reinforcement bar arranged between an upper joint reinforcement and a lower joint reinforcement.SOLUTION: An upper reinforcem...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ASAI HIROSHI, SUZUKA YOSHIKAZU, NAKATSUMI KENICHI, TAIRA YOSHIHIKO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a construction method of a floor slab and a joint structure of a PCa floor slab capable of reducing arranging-binding work at a job site of a reinforcement bar arranged between an upper joint reinforcement and a lower joint reinforcement.SOLUTION: An upper reinforcement bar 25 is bound in at least one of upper joint reinforcements 21U and 22U (Fig.6), and a lower reinforcement bar 26 is bound in at least one of lower joint reinforcements 21L and 22L. A first PCa floor slab 8A is precedently arranged in a predetermined first position P1 (Fig.7(A)), and a second PCa floor slab 8B is suspended later up to a predetermined height at which the second lower joint reinforcement 22L of the second PCa floor slab 8B becomes lower than the first upper joint reinforcement 21U of the first PCa floor slab 8A in a position separated from the first PCa floor slab 8A in a plan view more than a predetermined second position P2 (Fig.7(B)), and the second PCa floor slab 8B is laterally moved to the first PCa floor slab 8a-side in a predetermined height, and is arranged in a second position (Fig.7(C)-(D)). Afterwards, joint concrete 13 is placed in a clearance G.SELECTED DRAWING: Figure 7 【課題】上部継手鉄筋と下部継手鉄筋との間に配置される補強鉄筋の現場での配置、結束作業を減らすことができる床版の構築方法、及びPCa床版の継手構造を提供する。【解決手段】上継手鉄筋21U、22Uの少なくとも一方に上補強鉄筋25を結束し(図6)、下継手鉄筋21L、22Lの少なくとも一方に下補強鉄筋26を結束しておく。先行して第1PCa床版8Aを所定の第1位置P1に配置し(図7(A))、後から第2PCa床版8Bを、所定の第2位置P2よりも平面視で第1PCa床版8Aから離れた位置で、第2PCa床版8Bの第2下継手鉄筋22Lが第1PCa床版8Aの第1上継手鉄筋21Uよりも低くなる所定高さまで吊り下ろし(図7(B))、第2PCa床版8Bを所定高さで第1PCa床版8A側へ横移動させ、第2位置に配置する(図7(C)〜(D))。その後、隙間Gに継手コンクリート13を打設する(図7(E))。【選択図】図7