CONTROL METHOD, CONTROL PROGRAM, AND CONTROLLER
PROBLEM TO BE SOLVED: To optimize data volume evaluation timing for shortening a job execution time.SOLUTION: Provided is a control method in a controller that exercises control for causing one of a plurality of systems to execute a job, where the controller exercises control so to refer to a past j...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To optimize data volume evaluation timing for shortening a job execution time.SOLUTION: Provided is a control method in a controller that exercises control for causing one of a plurality of systems to execute a job, where the controller exercises control so to refer to a past job execution history relating to the plurality of systems, specify, prior to the execution start timing of a first job, a period in which a process of further updating a data storage area referred to by the first job is not executed, and have, included in the specified period, a timing at which to evaluate the data volume referred to by the first job from the data storage area and used when selecting a system that executes the first job from among the plurality of systems.SELECTED DRAWING: Figure 8
【課題】ジョブの実行時間短縮のためのデータ量の評価タイミングの適正化を図ることを目的とする。【解決手段】複数のシステムのうち、いずれかのシステムにジョブを実行させる制御を行なう制御装置における制御方法において、前記制御装置が、前記複数のシステムに関する過去のジョブの実行履歴を参照して、第1のジョブの実行開始タイミングに先行し、前記第1のジョブが参照するデータ格納領域に対する更なる更新処理が実行されない期間を特定し、前記複数のシステムの中から前記第1のジョブを実行させるシステムを選択する際に利用する、前記データ格納領域から前記第1のジョブが参照するデータ量の評価タイミングが、特定した前記期間に含まれるように制御する。【選択図】図8 |
---|