PILE STRUCTURE AND PILE ASSEMBLING METHOD

PROBLEM TO BE SOLVED: To accurately position a steel column and a cage, and shorten a hanging step.SOLUTION: A pile structure includes a cage 30B, a steel column 40B that is arranged in the central part of the cage 30B, and a fixing member 60 for fixing the cage 30B the steel column 40B together.SEL...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: OMOTO SATOSHI, HAMAKAWA RYOTA, HASE OSAMU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To accurately position a steel column and a cage, and shorten a hanging step.SOLUTION: A pile structure includes a cage 30B, a steel column 40B that is arranged in the central part of the cage 30B, and a fixing member 60 for fixing the cage 30B the steel column 40B together.SELECTED DRAWING: Figure 2 【課題】鉄骨柱と鉄筋カゴとを精度よく位置決めすると共に、吊り込みの工程を短縮する。【解決手段】杭構造は、鉄筋カゴ30Bと、鉄筋カゴ30Bの中心部に配置される鉄骨柱40Bと、鉄筋カゴ30Bと鉄骨柱40Bとを固定する固定部材60と、を備えている。【選択図】図2