SHIELD TUNNEL INSIDE CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To improve a construction efficiency of a shield tunnel.SOLUTION: A shield machine 1 excavates underground by its tip and assembles a segment 101 by its rear part. A subsequent carriage 11 is disposed behind the shield machine 1 and moves along with the excavation by the shield...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YOSHIMURA HAYATO, SAITO YUSUKE, ABE TAKASHI, TAKAHASHI KIMIKUNI, MORIGUCHI TOSHIMI, SATO TAKUYA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!