SHIELD TUNNEL INSIDE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To improve a construction efficiency of a shield tunnel.SOLUTION: A shield machine 1 excavates underground by its tip and assembles a segment 101 by its rear part. A subsequent carriage 11 is disposed behind the shield machine 1 and moves along with the excavation by the shield...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!