SHIELD TUNNEL INSIDE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To improve a construction efficiency of a shield tunnel.SOLUTION: A shield machine 1 excavates underground by its tip and assembles a segment 101 by its rear part. A subsequent carriage 11 is disposed behind the shield machine 1 and moves along with the excavation by the shield...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To improve a construction efficiency of a shield tunnel.SOLUTION: A shield machine 1 excavates underground by its tip and assembles a segment 101 by its rear part. A subsequent carriage 11 is disposed behind the shield machine 1 and moves along with the excavation by the shield machine 1. An invert block 102 is installed on a tunnel bottom between the shield machine 1 and the subsequent carriage 11 by a crane 14 mounted on the subsequent carriage 11. The subsequent carriage 11 is moved on the installed invert block 102. Floor surface construction members (an intermediate column 103 and a floor slab 106) are installed on the invert block 102 behind the subsequent carriage 11 by a crane 17 mounted on another carriage 15 in order to construct a floor surface.SELECTED DRAWING: Figure 3
【課題】 シールドトンネルの施工効率を向上させる。【解決手段】 シールド機1は、先端部で地中を掘削し後方部でセグメント101を組み立てる。後続台車11は、シールド機1の後方に配置されてシールド機1の掘進に伴って移動する。ここにおいて、シールド機1と後続台車11との間で、後続台車11に装備されたクレーン14により、トンネル底部にインバートブロック102を設置する。後続台車11は、設置済みのインバートブロック102上を移動させる。後続台車11の後方で、別の台車15に装備されたクレーン17により、インバートブロック102の上に床面構築部材(中間柱103及び床版106)を設置して、床面を構築する。【選択図】 図3 |
---|