MONITORING CONTROL SYSTEM

PROBLEM TO BE SOLVED: To maintain a voltage value of a distribution system to an optimum value by simultaneously controlling apparatuses of a distributing substation and apparatuses on a distribution line.SOLUTION: The monitoring control system includes a monitoring control apparatus 10 for monitori...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HAGIMOTO NOBUHIKO, EGUCHI TAKUSHI, KOBAYASHI KENJI, NAMBA MASAYUKI, WAKUDAIRA YASUYUKI, INOUE ATSUSHI, YAMAMOTO JUNYA, TAKAHASHI SHINSUKE, KONDO KENJI, MIYAZAKI TERU, KOBAYASHI DAIKI, OISHI TAKASHI, FURUNO KATSUYA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To maintain a voltage value of a distribution system to an optimum value by simultaneously controlling apparatuses of a distributing substation and apparatuses on a distribution line.SOLUTION: The monitoring control system includes a monitoring control apparatus 10 for monitoring control of a power system. The monitoring control apparatus 10 includes a centralized control unit 12a for voltage centralized control to maintain a voltage value of a distribution system to an optimum value by controlling apparatuses T11, T12, T13 of a distributing substation 800 and apparatuses SVR1, SVR2 of a distribution installation provided for a distribution system.SELECTED DRAWING: Figure 17 【課題】配電用変電所の機器と配電線の機器とを同時に制御することで配電系統の電圧値を適正値に保つ。【解決手段】電力系統を監視制御する監視制御装置10を備える監視制御システムであって、監視制御装置10は、配電用変電所800の機器T11,T12,T13と配電系統に設けられた配電設備の機器SVR1,SVR2とを制御して配電系統の電圧値を適正値に保つ電圧集中制御を行う集中制御部12aを有する。【選択図】図17