CONSTRUCTION GIRDER AND ERECTION METHOD OF CONSTRUCTION GIRDER
PROBLEM TO BE SOLVED: To provide a construction girder and an erection method thereof, capable of installing a sleeper in an optional position.SOLUTION: A construction girder 1 is installed under tracks 50 and 50, and supports the tracks 50 and 50. The tracks 50 are constituted of a track bed 51 for...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a construction girder and an erection method thereof, capable of installing a sleeper in an optional position.SOLUTION: A construction girder 1 is installed under tracks 50 and 50, and supports the tracks 50 and 50. The tracks 50 are constituted of a track bed 51 formed of ballast, the sleeper 52 arranged on the track bed 51 and a rail 53 arranged on the sleeper 52. The construction girder 1 comprises a box girder 11 being a box shape of opening an upper surface 11a and storing the ballast. The ballast stored in the box girder 11 forms at least a part of the track bed 51.
【課題】枕木を任意の位置に設置可能な工事桁、及び、その架設方法を提供する。【解決手段】工事桁1は、軌道50、50下に設置されて軌道50、50を支持する。軌道50は、バラストにより形成される道床51と、道床51上に配置される枕木52と、枕木52上に配置されるレール53と、により構成される。工事桁1は、上面11aが開口した箱形で、バラストを収容する箱桁11を備える。箱桁11内に収容されたバラストが、道床51の少なくとも一部を形成する。【選択図】図7 |
---|