METHOD AND SYSTEM FOR EVALUATING SOFTWARE DEVELOPMENT PROJECT
PROBLEM TO BE SOLVED: To estimate, efficiently with high accuracy, an index to a category attribute on the basis of numerical attribute data in project evaluation.SOLUTION: There are provided a project evaluation method and system, in which a first process is a first evaluation step for converting d...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To estimate, efficiently with high accuracy, an index to a category attribute on the basis of numerical attribute data in project evaluation.SOLUTION: There are provided a project evaluation method and system, in which a first process is a first evaluation step for converting data pertaining to a first index into data pertaining to a second index and rendering the converted data a first evaluation value; a second process is a second evaluation step for acquiring, on the basis of the data pertaining to the first index or data pertaining to an index other than that, the data pertaining to the second index in a method different from that in the first evaluation step and rendering the acquired data a second evaluation value; a third process is a third evaluation step for performing an arithmetic process to re-evaluate the first evaluation value by using the second evaluation value; and a fourth process is a database construction step for accumulating one or a plurality of the data pertaining to the first index, the first evaluation value, the second index, and the second evaluation value.
【課題】プロジェクト評価にて、数値属性のデータに基づいてカテゴリ属性の指標を効率的かつ精度よく見積もる。【解決手段】第1処理は第1指標に係るデータを第2指標に係るデータに変換し第1の評価値とする第1の評価工程であり、第2処理は第1指標に係るデータあるいはそれ以外の指標に係るデータにもとづき第1の評価工程とは異なる方法で第2指標に係るデータを取得し第2の評価値とする第2の評価工程であり、第3処理は前記第2の評価値を用いて前記第1の評価値を再評価する演算処理を行う第3の評価工程であり、第4処理は前記第1指標に係るデータ、前記第1の評価値、前記第2指標あるいは前記第2の評価値の一つあるいは複数を蓄積するデータベース構築工程であるプロジェクト評価方法及びシステム。【選択図】 図3 |
---|