JOINT FILLER STRUCTURE OF TUNNEL CENTRE

PROBLEM TO BE SOLVED: To provide a joint filler structure that can be used even in s telescopic mold tunnel centre and can be used in a tunnel curved part well.SOLUTION: A joint filler structure of a tunnel centre is configured by: positioning a formwork 2 in the tunnel longitudinal direction to a f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TERASONO HIROTAKE, NISHIURA HIDEAKI, KUGE ATSUSHI, MORINO HIROYUKI, AKIYOSHI KENJI, FUJIMI AKIRA, OKUBO TSUNEHIDE, NAKAMURA AKIRA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a joint filler structure that can be used even in s telescopic mold tunnel centre and can be used in a tunnel curved part well.SOLUTION: A joint filler structure of a tunnel centre is configured by: positioning a formwork 2 in the tunnel longitudinal direction to a formwork 1 during lining concrete curing in the tunnel centre; providing a joint member 7 and a joint member 3 for forming a projection Pr following a cross-sectional shape of the joint of the lining concrete by being brought into abutment with an end face 11 of the formwork 1 and an end face of the formwork 2 opposed to each other, respectively; and movably providing a joint material piece 3 in the tunnel longitudinal direction, so that the joint material piece 3 can be moved toward a joint material piece 7 until coming into contact with the same so as to close a gap Gp between the end faces 11 and 21 of the formwork 1 and the formwork 2 from the outward in the radial direction. 【課題】テレスコピック型トンネルセントルでも使用可能で、かつトンネル湾曲部においても良好に使用できる。【解決手段】トンネルセントルにおける覆工コンクリート養生中の型枠1に対してトンネル長手方向へ型枠2を位置させ、互に対向する型枠1の端面11と型枠2の端面21にそれぞれ、互いに当接させられて覆工コンクリートの目地の断面形状に倣った突出部Prを形成する目地材片7と目地材片3を設け、目地材片3をトンネル長手方向へ移動可能に設けて、型枠1および型枠2の端面11,21間の間隙Gpを径方向の外方から塞ぐように目地材片3を目地材片7に向けてこれに接するまで移動可能とする。【選択図】 図1