SYSTEMS AND METHODS FOR GENERATING PREDICTABLE LOAD UPON COMPLETION OF START SEQUENCE OF TURBINE
PROBLEM TO BE SOLVED: To provide systems and methods for generating a predictable load upon a completion of a start sequence of a gas turbine.SOLUTION: A system may include a controller to control the gas turbine, and a processor communicatively coupled to the controller. The processor may be config...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide systems and methods for generating a predictable load upon a completion of a start sequence of a gas turbine.SOLUTION: A system may include a controller to control the gas turbine, and a processor communicatively coupled to the controller. The processor may be configured to receive a start duration and a desired final load, and to calculate a target load rate to substantially reach the desired final load within the start duration on the basis of the start duration and the desired final load. Measurements of a present load rate may be received from a measuring device and used to periodically recalculate the target load rate. The present load rate may be periodically adjusted by the controller on the basis of the recalculation. |
---|