SYSTEM FLOOR

PROBLEM TO BE SOLVED: To provide a system floor that can solve the problem of insufficiency in capacity of a wiring pit and achieves easy height adjustment if the floor is uneven.SOLUTION: A strut bolt 5 is screwed in after providing a strut base 6 in a floor mat 7 and forming a screw hole, and leve...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KOMINE SHINJI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a system floor that can solve the problem of insufficiency in capacity of a wiring pit and achieves easy height adjustment if the floor is uneven.SOLUTION: A strut bolt 5 is screwed in after providing a strut base 6 in a floor mat 7 and forming a screw hole, and level adjusting is performed. The floor mat is flattened by a plug-in connection part 8. When the capacity of a wiring pit is required, a block strut is added and the height is increased. The inner wiring can be checked through a transparent lid of the system floor.