METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a scheduling method for executing at least one test model on a test device.SOLUTION: A first scheduler is activated on the basis of an external activate signal. The first scheduler executes a test model or a prescribed part of the test model corresponding to a prescr...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LEINFELLNER ROBERT WOELFER THOMAS RICHERT JOBST GROSSE BOERGER RALF BRUSKI NICOLA MILLER EDUARD KRISP HOLGER |
description | PROBLEM TO BE SOLVED: To provide a scheduling method for executing at least one test model on a test device.SOLUTION: A first scheduler is activated on the basis of an external activate signal. The first scheduler executes a test model or a prescribed part of the test model corresponding to a prescribed computation interval. After execution of the test model or the prescribed part of the test model is over, the first scheduler shows completion of the computation by a termination signal. When the test model has a plurality of test systems to which simultaneous processing should be performed, the first scheduler calls a second scheduler and instructs a test system to which simultaneous processing is to be performed. The second scheduler serially executes the test system to which the simultaneous processing is to be performed. The second scheduler shows the first scheduler execution completion after all the test systems to which the simultaneous processing is to be performed are processed, and the first scheduler shows completion of the computation by a termination signal. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2014041158A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2014041158A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2014041158A3</originalsourceid><addsrcrecordid>eNrjZNDxdQ3x8HdRcPMPUghxDQ7x9HNXcPVxdQ4J8vfzdFZw9vcDsnwUgiODQ1x9eRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvFeAkYGhiYGJoaGphaMxUYoA9qslzw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM</title><source>esp@cenet</source><creator>LEINFELLNER ROBERT ; WOELFER THOMAS ; RICHERT JOBST ; GROSSE BOERGER RALF ; BRUSKI NICOLA ; MILLER EDUARD ; KRISP HOLGER</creator><creatorcontrib>LEINFELLNER ROBERT ; WOELFER THOMAS ; RICHERT JOBST ; GROSSE BOERGER RALF ; BRUSKI NICOLA ; MILLER EDUARD ; KRISP HOLGER</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a scheduling method for executing at least one test model on a test device.SOLUTION: A first scheduler is activated on the basis of an external activate signal. The first scheduler executes a test model or a prescribed part of the test model corresponding to a prescribed computation interval. After execution of the test model or the prescribed part of the test model is over, the first scheduler shows completion of the computation by a termination signal. When the test model has a plurality of test systems to which simultaneous processing should be performed, the first scheduler calls a second scheduler and instructs a test system to which simultaneous processing is to be performed. The second scheduler serially executes the test system to which the simultaneous processing is to be performed. The second scheduler shows the first scheduler execution completion after all the test systems to which the simultaneous processing is to be performed are processed, and the first scheduler shows completion of the computation by a termination signal.</description><language>eng</language><subject>MEASURING ; PHYSICS ; TESTING ; TESTING STATIC OR DYNAMIC BALANCE OF MACHINES ORSTRUCTURES ; TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR</subject><creationdate>2014</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140306&DB=EPODOC&CC=JP&NR=2014041158A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140306&DB=EPODOC&CC=JP&NR=2014041158A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LEINFELLNER ROBERT</creatorcontrib><creatorcontrib>WOELFER THOMAS</creatorcontrib><creatorcontrib>RICHERT JOBST</creatorcontrib><creatorcontrib>GROSSE BOERGER RALF</creatorcontrib><creatorcontrib>BRUSKI NICOLA</creatorcontrib><creatorcontrib>MILLER EDUARD</creatorcontrib><creatorcontrib>KRISP HOLGER</creatorcontrib><title>METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a scheduling method for executing at least one test model on a test device.SOLUTION: A first scheduler is activated on the basis of an external activate signal. The first scheduler executes a test model or a prescribed part of the test model corresponding to a prescribed computation interval. After execution of the test model or the prescribed part of the test model is over, the first scheduler shows completion of the computation by a termination signal. When the test model has a plurality of test systems to which simultaneous processing should be performed, the first scheduler calls a second scheduler and instructs a test system to which simultaneous processing is to be performed. The second scheduler serially executes the test system to which the simultaneous processing is to be performed. The second scheduler shows the first scheduler execution completion after all the test systems to which the simultaneous processing is to be performed are processed, and the first scheduler shows completion of the computation by a termination signal.</description><subject>MEASURING</subject><subject>PHYSICS</subject><subject>TESTING</subject><subject>TESTING STATIC OR DYNAMIC BALANCE OF MACHINES ORSTRUCTURES</subject><subject>TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2014</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDxdQ3x8HdRcPMPUghxDQ7x9HNXcPVxdQ4J8vfzdFZw9vcDsnwUgiODQ1x9eRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvFeAkYGhiYGJoaGphaMxUYoA9qslzw</recordid><startdate>20140306</startdate><enddate>20140306</enddate><creator>LEINFELLNER ROBERT</creator><creator>WOELFER THOMAS</creator><creator>RICHERT JOBST</creator><creator>GROSSE BOERGER RALF</creator><creator>BRUSKI NICOLA</creator><creator>MILLER EDUARD</creator><creator>KRISP HOLGER</creator><scope>EVB</scope></search><sort><creationdate>20140306</creationdate><title>METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM</title><author>LEINFELLNER ROBERT ; WOELFER THOMAS ; RICHERT JOBST ; GROSSE BOERGER RALF ; BRUSKI NICOLA ; MILLER EDUARD ; KRISP HOLGER</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2014041158A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2014</creationdate><topic>MEASURING</topic><topic>PHYSICS</topic><topic>TESTING</topic><topic>TESTING STATIC OR DYNAMIC BALANCE OF MACHINES ORSTRUCTURES</topic><topic>TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LEINFELLNER ROBERT</creatorcontrib><creatorcontrib>WOELFER THOMAS</creatorcontrib><creatorcontrib>RICHERT JOBST</creatorcontrib><creatorcontrib>GROSSE BOERGER RALF</creatorcontrib><creatorcontrib>BRUSKI NICOLA</creatorcontrib><creatorcontrib>MILLER EDUARD</creatorcontrib><creatorcontrib>KRISP HOLGER</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LEINFELLNER ROBERT</au><au>WOELFER THOMAS</au><au>RICHERT JOBST</au><au>GROSSE BOERGER RALF</au><au>BRUSKI NICOLA</au><au>MILLER EDUARD</au><au>KRISP HOLGER</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM</title><date>2014-03-06</date><risdate>2014</risdate><abstract>PROBLEM TO BE SOLVED: To provide a scheduling method for executing at least one test model on a test device.SOLUTION: A first scheduler is activated on the basis of an external activate signal. The first scheduler executes a test model or a prescribed part of the test model corresponding to a prescribed computation interval. After execution of the test model or the prescribed part of the test model is over, the first scheduler shows completion of the computation by a termination signal. When the test model has a plurality of test systems to which simultaneous processing should be performed, the first scheduler calls a second scheduler and instructs a test system to which simultaneous processing is to be performed. The second scheduler serially executes the test system to which the simultaneous processing is to be performed. The second scheduler shows the first scheduler execution completion after all the test systems to which the simultaneous processing is to be performed are processed, and the first scheduler shows completion of the computation by a termination signal.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2014041158A |
source | esp@cenet |
subjects | MEASURING PHYSICS TESTING TESTING STATIC OR DYNAMIC BALANCE OF MACHINES ORSTRUCTURES TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR |
title | METHOD FOR TESTING ELECTRONIC CONTROL SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T03%3A30%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LEINFELLNER%20ROBERT&rft.date=2014-03-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2014041158A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |