UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM

PROBLEM TO BE SOLVED: To provide a seafloor foundation construction method capable of: effectively reducing work time required for an upper surface leveling process; shortening a construction period of a seafloor foundation; and reducing a cost such as a labor cost required for construction.SOLUTION...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: NODA TOMONORI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NODA TOMONORI
description PROBLEM TO BE SOLVED: To provide a seafloor foundation construction method capable of: effectively reducing work time required for an upper surface leveling process; shortening a construction period of a seafloor foundation; and reducing a cost such as a labor cost required for construction.SOLUTION: A weight 3 lifted by a crane 10 is repeatedly dropped to tamp down and level an upper surface of a riprap foundation. An information processing device 20 calculates a variation in heights of a reflection prism 25 before and after the weight 3 is dropped. The information processing device 20 also calculates a difference between the height of the riprap foundation at a present time and a construction height of the riprap foundation on the basis of the height of the reflection prism 25. In addition, the information processing device 20 calculates a lifting height of the weight 3.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2013221285A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2013221285A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2013221285A3</originalsourceid><addsrcrecordid>eNrjZMgIDQhwDVIIDg1yc3R2VfBxDXP18fRzV_B1DfHwd9FRCHZ1dPPx9w9ScPMP9XNxDPH091Nw9vcLDgkKdQZzIAoVHP1cFHAYFRwZHOLqy8PAmpaYU5zKC6W5GZTcXEOcPXRTC_LjU4sLEpNT81JL4r0CjAwMjY2MDI0sTB2NiVIEAMPqNnA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM</title><source>esp@cenet</source><creator>NODA TOMONORI</creator><creatorcontrib>NODA TOMONORI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a seafloor foundation construction method capable of: effectively reducing work time required for an upper surface leveling process; shortening a construction period of a seafloor foundation; and reducing a cost such as a labor cost required for construction.SOLUTION: A weight 3 lifted by a crane 10 is repeatedly dropped to tamp down and level an upper surface of a riprap foundation. An information processing device 20 calculates a variation in heights of a reflection prism 25 before and after the weight 3 is dropped. The information processing device 20 also calculates a difference between the height of the riprap foundation at a present time and a construction height of the riprap foundation on the basis of the height of the reflection prism 25. In addition, the information processing device 20 calculates a lifting height of the weight 3.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GYROSCOPIC INSTRUMENTS ; HYDRAULIC ENGINEERING ; MEASURING ; MEASURING DISTANCES, LEVELS OR BEARINGS ; NAVIGATION ; PHOTOGRAMMETRY OR VIDEOGRAMMETRY ; PHYSICS ; SOIL SHIFTING ; SURVEYING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20131028&amp;DB=EPODOC&amp;CC=JP&amp;NR=2013221285A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20131028&amp;DB=EPODOC&amp;CC=JP&amp;NR=2013221285A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NODA TOMONORI</creatorcontrib><title>UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a seafloor foundation construction method capable of: effectively reducing work time required for an upper surface leveling process; shortening a construction period of a seafloor foundation; and reducing a cost such as a labor cost required for construction.SOLUTION: A weight 3 lifted by a crane 10 is repeatedly dropped to tamp down and level an upper surface of a riprap foundation. An information processing device 20 calculates a variation in heights of a reflection prism 25 before and after the weight 3 is dropped. The information processing device 20 also calculates a difference between the height of the riprap foundation at a present time and a construction height of the riprap foundation on the basis of the height of the reflection prism 25. In addition, the information processing device 20 calculates a lifting height of the weight 3.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GYROSCOPIC INSTRUMENTS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MEASURING</subject><subject>MEASURING DISTANCES, LEVELS OR BEARINGS</subject><subject>NAVIGATION</subject><subject>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>SURVEYING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZMgIDQhwDVIIDg1yc3R2VfBxDXP18fRzV_B1DfHwd9FRCHZ1dPPx9w9ScPMP9XNxDPH091Nw9vcLDgkKdQZzIAoVHP1cFHAYFRwZHOLqy8PAmpaYU5zKC6W5GZTcXEOcPXRTC_LjU4sLEpNT81JL4r0CjAwMjY2MDI0sTB2NiVIEAMPqNnA</recordid><startdate>20131028</startdate><enddate>20131028</enddate><creator>NODA TOMONORI</creator><scope>EVB</scope></search><sort><creationdate>20131028</creationdate><title>UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM</title><author>NODA TOMONORI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2013221285A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2013</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GYROSCOPIC INSTRUMENTS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MEASURING</topic><topic>MEASURING DISTANCES, LEVELS OR BEARINGS</topic><topic>NAVIGATION</topic><topic>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>SURVEYING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NODA TOMONORI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NODA TOMONORI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM</title><date>2013-10-28</date><risdate>2013</risdate><abstract>PROBLEM TO BE SOLVED: To provide a seafloor foundation construction method capable of: effectively reducing work time required for an upper surface leveling process; shortening a construction period of a seafloor foundation; and reducing a cost such as a labor cost required for construction.SOLUTION: A weight 3 lifted by a crane 10 is repeatedly dropped to tamp down and level an upper surface of a riprap foundation. An information processing device 20 calculates a variation in heights of a reflection prism 25 before and after the weight 3 is dropped. The information processing device 20 also calculates a difference between the height of the riprap foundation at a present time and a construction height of the riprap foundation on the basis of the height of the reflection prism 25. In addition, the information processing device 20 calculates a lifting height of the weight 3.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2013221285A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GYROSCOPIC INSTRUMENTS
HYDRAULIC ENGINEERING
MEASURING
MEASURING DISTANCES, LEVELS OR BEARINGS
NAVIGATION
PHOTOGRAMMETRY OR VIDEOGRAMMETRY
PHYSICS
SOIL SHIFTING
SURVEYING
TESTING
UNDERGROUND OR UNDERWATER STRUCTURES
title UPPER SURFACE LEVELING METHOD, SEAFLOOR FOUNDATION CONSTRUCTION METHOD AND UPPER SURFACE LEVELING SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T08%3A26%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NODA%20TOMONORI&rft.date=2013-10-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2013221285A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true