TUNNEL CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a tunnel construction method which can suppress tunnel construction cost.SOLUTION: A tunnel construction method comprises the steps of: irradiating a first irradiation point (P) on a face plane by laser irradiation of a total station (20); bringing the tip of a rod (...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a tunnel construction method which can suppress tunnel construction cost.SOLUTION: A tunnel construction method comprises the steps of: irradiating a first irradiation point (P) on a face plane by laser irradiation of a total station (20); bringing the tip of a rod (13) of an attitude adjustable guide shell (11) into contact with the first irradiation point (P); irradiating a second irradiation point (Q) different from the first irradiation point (P) by the laser irradiation of the total station (20); adjusting the attitude of the guide shell (11) so that an irradiation point is formed on a target (15) provided on the rear end of the guide shell (11); and drilling a hole by the rod (13) of the attitude adjusted guide shell (11). |
---|