POWER SUPPLY SYSTEM

PROBLEM TO BE SOLVED: To solve the following problem: In starting a distributed power generation system using electric power of a storage battery during power failure, a user does not grasp a relationship between electric energy required for starting the distributed power generation system and remai...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NAGASATO HIROSHI, FUKUYASU MASAYUKI, KIHARA MASAHITO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NAGASATO HIROSHI
FUKUYASU MASAYUKI
KIHARA MASAHITO
description PROBLEM TO BE SOLVED: To solve the following problem: In starting a distributed power generation system using electric power of a storage battery during power failure, a user does not grasp a relationship between electric energy required for starting the distributed power generation system and remaining electric energy of the storage battery; therefore, the user continues to use electric power and hence the required electric energy for starting may become insufficient.SOLUTION: An electric power component required for starting a distributed power generation system is made invisible to a user by subtracting the power component from a remaining amount of a storage battery. Thus, the distributed power generation system can start more completely and hence a user can use electric power from the distributed power generation system even during power failure.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2013090370A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2013090370A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2013090370A3</originalsourceid><addsrcrecordid>eNrjZBAO8A93DVIIDg0I8IlUCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGxgaWBsbmBo7GRCkCALFTHv8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>POWER SUPPLY SYSTEM</title><source>esp@cenet</source><creator>NAGASATO HIROSHI ; FUKUYASU MASAYUKI ; KIHARA MASAHITO</creator><creatorcontrib>NAGASATO HIROSHI ; FUKUYASU MASAYUKI ; KIHARA MASAHITO</creatorcontrib><description>PROBLEM TO BE SOLVED: To solve the following problem: In starting a distributed power generation system using electric power of a storage battery during power failure, a user does not grasp a relationship between electric energy required for starting the distributed power generation system and remaining electric energy of the storage battery; therefore, the user continues to use electric power and hence the required electric energy for starting may become insufficient.SOLUTION: An electric power component required for starting a distributed power generation system is made invisible to a user by subtracting the power component from a remaining amount of a storage battery. Thus, the distributed power generation system can start more completely and hence a user can use electric power from the distributed power generation system even during power failure.</description><language>eng</language><subject>BASIC ELECTRIC ELEMENTS ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSIONOF CHEMICAL INTO ELECTRICAL ENERGY ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130513&amp;DB=EPODOC&amp;CC=JP&amp;NR=2013090370A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130513&amp;DB=EPODOC&amp;CC=JP&amp;NR=2013090370A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NAGASATO HIROSHI</creatorcontrib><creatorcontrib>FUKUYASU MASAYUKI</creatorcontrib><creatorcontrib>KIHARA MASAHITO</creatorcontrib><title>POWER SUPPLY SYSTEM</title><description>PROBLEM TO BE SOLVED: To solve the following problem: In starting a distributed power generation system using electric power of a storage battery during power failure, a user does not grasp a relationship between electric energy required for starting the distributed power generation system and remaining electric energy of the storage battery; therefore, the user continues to use electric power and hence the required electric energy for starting may become insufficient.SOLUTION: An electric power component required for starting a distributed power generation system is made invisible to a user by subtracting the power component from a remaining amount of a storage battery. Thus, the distributed power generation system can start more completely and hence a user can use electric power from the distributed power generation system even during power failure.</description><subject>BASIC ELECTRIC ELEMENTS</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSIONOF CHEMICAL INTO ELECTRICAL ENERGY</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBAO8A93DVIIDg0I8IlUCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGxgaWBsbmBo7GRCkCALFTHv8</recordid><startdate>20130513</startdate><enddate>20130513</enddate><creator>NAGASATO HIROSHI</creator><creator>FUKUYASU MASAYUKI</creator><creator>KIHARA MASAHITO</creator><scope>EVB</scope></search><sort><creationdate>20130513</creationdate><title>POWER SUPPLY SYSTEM</title><author>NAGASATO HIROSHI ; FUKUYASU MASAYUKI ; KIHARA MASAHITO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2013090370A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2013</creationdate><topic>BASIC ELECTRIC ELEMENTS</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSIONOF CHEMICAL INTO ELECTRICAL ENERGY</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>NAGASATO HIROSHI</creatorcontrib><creatorcontrib>FUKUYASU MASAYUKI</creatorcontrib><creatorcontrib>KIHARA MASAHITO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NAGASATO HIROSHI</au><au>FUKUYASU MASAYUKI</au><au>KIHARA MASAHITO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>POWER SUPPLY SYSTEM</title><date>2013-05-13</date><risdate>2013</risdate><abstract>PROBLEM TO BE SOLVED: To solve the following problem: In starting a distributed power generation system using electric power of a storage battery during power failure, a user does not grasp a relationship between electric energy required for starting the distributed power generation system and remaining electric energy of the storage battery; therefore, the user continues to use electric power and hence the required electric energy for starting may become insufficient.SOLUTION: An electric power component required for starting a distributed power generation system is made invisible to a user by subtracting the power component from a remaining amount of a storage battery. Thus, the distributed power generation system can start more completely and hence a user can use electric power from the distributed power generation system even during power failure.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2013090370A
source esp@cenet
subjects BASIC ELECTRIC ELEMENTS
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSIONOF CHEMICAL INTO ELECTRICAL ENERGY
SYSTEMS FOR STORING ELECTRIC ENERGY
title POWER SUPPLY SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T10%3A18%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NAGASATO%20HIROSHI&rft.date=2013-05-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2013090370A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true