BRIDGE FACE CONSTRUCTION METHOD AND TEMPORARY FENCE INSTALLATION DEVICE USED FOR THE METHOD

PROBLEM TO BE SOLVED: To eliminate the danger that a person or thing falls from a bridge face before a guard fence is installed, when a bridge is constructed.SOLUTION: A first temporary fence 1 is installed apart from a bridge face edge Aa, and a work vehicle consisting of a temporary fence installa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOMURO YAICHIRO, OCHIAI HIROYUKI, MIZUOCHI NAOTO, YOSHIOKA KENICHI, ASAI HIROTAKA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To eliminate the danger that a person or thing falls from a bridge face before a guard fence is installed, when a bridge is constructed.SOLUTION: A first temporary fence 1 is installed apart from a bridge face edge Aa, and a work vehicle consisting of a temporary fence installation device 3 is arranged inside the first temporary fence 1. The temporary fence installation device 3 is configured to support a second temporary fence 2 movably and to move and arrange the second temporary fence 2 at the bridge face edge Aa as shown by arrows E2, E3. The operation to install the second temporary fence 2 can be performed from inside the first temporary fence 1, and the danger that a person or thing (a tool or material) falls from the bridge face A can be eliminate.