EXPANSION JOINT REMOVING METHOD AND ROAD CUTTING METHOD

PROBLEM TO BE SOLVED: To provide an expansion joint removing method that suppresses water leakage from an expansion spacing section and that enables an expansion joint to be removed in a short amount of time without cutting of a reinforcement, and a road cutting method.SOLUTION: The formation of a w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FUJIO KOJI, INOUE MASAFUMI, KOMOTO KATSUAKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide an expansion joint removing method that suppresses water leakage from an expansion spacing section and that enables an expansion joint to be removed in a short amount of time without cutting of a reinforcement, and a road cutting method.SOLUTION: The formation of a weir 7b can inhibit water, which is jetted from a collision nozzle 41, from flowing into an expansion spacing section 2, restrain a noise, which is generated by water injection, from being propagated to the expansion spacing section 2, prevent the water from falling onto a store installed below a bridge 52, a parked vehicle and the like, and restrain a noise problem from being caused by the reverberation of the noise in the expansion spacing section 2.