METHOD FOR CONTROLLING MULTI-CAN INSTALLED BOILER SYSTEM
PROBLEM TO BE SOLVED: To provide a method for controlling a multi-can installed boiler system that can stably supply vapor to a facility where the vapor is used while prioritizing a low combustion state to sudden load increase when starting the facility where the vapor is used.SOLUTION: In the metho...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a method for controlling a multi-can installed boiler system that can stably supply vapor to a facility where the vapor is used while prioritizing a low combustion state to sudden load increase when starting the facility where the vapor is used.SOLUTION: In the method for controlling the multi-can installed boiler system 100, when a boiler 101 that is an off-state is started because of the start of the facility 107 where the vapor is used, if the boiler 101 that is in a low-combustion state in a plurality of boilers 101 when starting the facility 107 where the vapor is used, the boiler 101 that is in the low-combustion state is switched into a high combustion state, and a boiler 101 to be started is made to stand by in a pre-purge state. |
---|