METHOD FOR CONTROLLING MULTI-CAN INSTALLED BOILER SYSTEM

PROBLEM TO BE SOLVED: To provide a method for controlling a multi-can installed boiler system that can stably supply vapor to a facility where the vapor is used while prioritizing a low combustion state to sudden load increase when starting the facility where the vapor is used.SOLUTION: In the metho...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ITO SADAYOSHI, ISOMI AKIRA, TABATA DAISUKE
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a method for controlling a multi-can installed boiler system that can stably supply vapor to a facility where the vapor is used while prioritizing a low combustion state to sudden load increase when starting the facility where the vapor is used.SOLUTION: In the method for controlling the multi-can installed boiler system 100, when a boiler 101 that is an off-state is started because of the start of the facility 107 where the vapor is used, if the boiler 101 that is in a low-combustion state in a plurality of boilers 101 when starting the facility 107 where the vapor is used, the boiler 101 that is in the low-combustion state is switched into a high combustion state, and a boiler 101 to be started is made to stand by in a pre-purge state.