ASBESTOS REMOVING METHOD
PROBLEM TO BE SOLVED: To provide an asbestos removing method capable of improving working efficiency in a superhigh-rise elevator shaft.SOLUTION: This asbestos removing method includes a step of arranging a work floor 20 on the lower end of this work division P by arranging the work division P over...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide an asbestos removing method capable of improving working efficiency in a superhigh-rise elevator shaft.SOLUTION: This asbestos removing method includes a step of arranging a work floor 20 on the lower end of this work division P by arranging the work division P over a plurality of floors in the elevator shaft 10, a step of arranging a temporary scaffold 30 extending up to the upper end of the work division P on the work floor 20, and a step of removing asbestos by using the work floor 20 and the temporary scaffold 30. According to the method, since horizontal curing can be performed by the work floor 20 when assembling the temporary scaffold 30, even when materials and tools are dropped from above the temporary scaffold 30, these dropped materials and tools are not dropped under the work floor 20. Thus, not only safety of work can be secured but also the working efficiency in the superhigh-rise elevator shaft can be improved. |
---|