AIR CONDITIONING SYSTEM AND BUILDING
PROBLEM TO BE SOLVED: To provide an air conditioning system that can be made substantially maintenance-free. SOLUTION: An air conditioner 302 is installed in an underfloor space 4 of a building 1. An air conditioner 3 is constituted by connecting in a ventilable manner an indoor unit 3A of an air co...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ASAGIRI DAISUKE |
description | PROBLEM TO BE SOLVED: To provide an air conditioning system that can be made substantially maintenance-free. SOLUTION: An air conditioner 302 is installed in an underfloor space 4 of a building 1. An air conditioner 3 is constituted by connecting in a ventilable manner an indoor unit 3A of an air conditioner serving as a downstream air conditioning body device having an air conditioning and heating function and a dehumidifying function, to an air washer 3B serving as an upstream gas-liquid contact type air cleaner. The air conditioner 302 includes, on the air washer 3B side, an inside air suction part 31B communicating, through a duct 83, with an exhaust port 6 provided in a floor part 1a of the building 1, and includes, on the indoor unit 3A side of the air conditioner, an above-floor blowoff part 32 communicating, through a duct 82, with an air supply port 7 provided in the floor part 1a of the building 1. COPYRIGHT: (C)2011,JPO&INPIT |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2011179807A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2011179807A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2011179807A3</originalsourceid><addsrcrecordid>eNrjZFBx9AxScPb3c_EM8fT38_RzVwiODA5x9VVw9HNRcAr19HEBivEwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDQ0NDc0sLA3NHY6IUAQC-dyNu</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>AIR CONDITIONING SYSTEM AND BUILDING</title><source>esp@cenet</source><creator>ASAGIRI DAISUKE</creator><creatorcontrib>ASAGIRI DAISUKE</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide an air conditioning system that can be made substantially maintenance-free. SOLUTION: An air conditioner 302 is installed in an underfloor space 4 of a building 1. An air conditioner 3 is constituted by connecting in a ventilable manner an indoor unit 3A of an air conditioner serving as a downstream air conditioning body device having an air conditioning and heating function and a dehumidifying function, to an air washer 3B serving as an upstream gas-liquid contact type air cleaner. The air conditioner 302 includes, on the air washer 3B side, an inside air suction part 31B communicating, through a duct 83, with an exhaust port 6 provided in a floor part 1a of the building 1, and includes, on the indoor unit 3A side of the air conditioner, an above-floor blowoff part 32 communicating, through a duct 82, with an air supply port 7 provided in the floor part 1a of the building 1. COPYRIGHT: (C)2011,JPO&INPIT</description><language>eng</language><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING ; BLASTING ; BUILDING ; FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS ; FIXED CONSTRUCTIONS ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; RANGES ; VENTILATING ; WEAPONS</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110915&DB=EPODOC&CC=JP&NR=2011179807A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110915&DB=EPODOC&CC=JP&NR=2011179807A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ASAGIRI DAISUKE</creatorcontrib><title>AIR CONDITIONING SYSTEM AND BUILDING</title><description>PROBLEM TO BE SOLVED: To provide an air conditioning system that can be made substantially maintenance-free. SOLUTION: An air conditioner 302 is installed in an underfloor space 4 of a building 1. An air conditioner 3 is constituted by connecting in a ventilable manner an indoor unit 3A of an air conditioner serving as a downstream air conditioning body device having an air conditioning and heating function and a dehumidifying function, to an air washer 3B serving as an upstream gas-liquid contact type air cleaner. The air conditioner 302 includes, on the air washer 3B side, an inside air suction part 31B communicating, through a duct 83, with an exhaust port 6 provided in a floor part 1a of the building 1, and includes, on the indoor unit 3A side of the air conditioner, an above-floor blowoff part 32 communicating, through a duct 82, with an air supply port 7 provided in the floor part 1a of the building 1. COPYRIGHT: (C)2011,JPO&INPIT</description><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</subject><subject>BLASTING</subject><subject>BUILDING</subject><subject>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>RANGES</subject><subject>VENTILATING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBx9AxScPb3c_EM8fT38_RzVwiODA5x9VVw9HNRcAr19HEBivEwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDQ0NDc0sLA3NHY6IUAQC-dyNu</recordid><startdate>20110915</startdate><enddate>20110915</enddate><creator>ASAGIRI DAISUKE</creator><scope>EVB</scope></search><sort><creationdate>20110915</creationdate><title>AIR CONDITIONING SYSTEM AND BUILDING</title><author>ASAGIRI DAISUKE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2011179807A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2011</creationdate><topic>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</topic><topic>BLASTING</topic><topic>BUILDING</topic><topic>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>RANGES</topic><topic>VENTILATING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ASAGIRI DAISUKE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ASAGIRI DAISUKE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>AIR CONDITIONING SYSTEM AND BUILDING</title><date>2011-09-15</date><risdate>2011</risdate><abstract>PROBLEM TO BE SOLVED: To provide an air conditioning system that can be made substantially maintenance-free. SOLUTION: An air conditioner 302 is installed in an underfloor space 4 of a building 1. An air conditioner 3 is constituted by connecting in a ventilable manner an indoor unit 3A of an air conditioner serving as a downstream air conditioning body device having an air conditioning and heating function and a dehumidifying function, to an air washer 3B serving as an upstream gas-liquid contact type air cleaner. The air conditioner 302 includes, on the air washer 3B side, an inside air suction part 31B communicating, through a duct 83, with an exhaust port 6 provided in a floor part 1a of the building 1, and includes, on the indoor unit 3A side of the air conditioner, an above-floor blowoff part 32 communicating, through a duct 82, with an air supply port 7 provided in the floor part 1a of the building 1. COPYRIGHT: (C)2011,JPO&INPIT</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2011179807A |
source | esp@cenet |
subjects | AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING BLASTING BUILDING FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS FIXED CONSTRUCTIONS HEATING LIGHTING MECHANICAL ENGINEERING RANGES VENTILATING WEAPONS |
title | AIR CONDITIONING SYSTEM AND BUILDING |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T16%3A08%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ASAGIRI%20DAISUKE&rft.date=2011-09-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2011179807A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |