FAILURE REPORT MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To urge positive failure reports from people other than inspection personnel performing periodic inspection and to appropriately and quickly deal with failed portions. SOLUTION: A failure report management system includes: a failure report information acquisition means 21 for a...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To urge positive failure reports from people other than inspection personnel performing periodic inspection and to appropriately and quickly deal with failed portions. SOLUTION: A failure report management system includes: a failure report information acquisition means 21 for acquiring failure report information such that failure information is tagged with the identification information of a failure reporter who has provided the failure information; an importance point calculation means 22 for calculating importance points obtained through numerical conversion corresponding to the importance of the failure report information obtained; an importance point management means by reporter 23 for managing the importance points for each failure reporter; and a benefit imparting means 24 for imparting benefits to the failure reporter according to the importance points. COPYRIGHT: (C)2011,JPO&INPIT |
---|