AIR CONDITIONING SYSTEM

PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION:...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MORIMOTO KUNITAKA, TSUNODA HISASHI, HAYASHI MARIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MORIMOTO KUNITAKA
TSUNODA HISASHI
HAYASHI MARIO
description PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION: A centralized control device 2 includes a signal transmitting/receiving part 22 transmitting a control signal including control information to an air conditioner, and an information adding part 23 adding control information relative to a remote controller 4 to an empty bit not handled as a bit to which the control information is added in the control signal. The air conditioner 3 includes a signal receiving part 32 receiving the control signal from the centralized control device 2, a control part 31 controlling the operation mechanism of the air conditioner 3 in accordance with the control information added to a part other than the empty bit in the control signal, and a control signal transmitting part 33 transmitting the received control signal to the remote controller 4 connected to the air conditioner 3. COPYRIGHT: (C)2011,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2010276316A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2010276316A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2010276316A3</originalsourceid><addsrcrecordid>eNrjZBB39AxScPb3c_EM8fT38_RzVwiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhgZG5mbGhmaOxkQpAgAZsR_w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>AIR CONDITIONING SYSTEM</title><source>esp@cenet</source><creator>MORIMOTO KUNITAKA ; TSUNODA HISASHI ; HAYASHI MARIO</creator><creatorcontrib>MORIMOTO KUNITAKA ; TSUNODA HISASHI ; HAYASHI MARIO</creatorcontrib><description>PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION: A centralized control device 2 includes a signal transmitting/receiving part 22 transmitting a control signal including control information to an air conditioner, and an information adding part 23 adding control information relative to a remote controller 4 to an empty bit not handled as a bit to which the control information is added in the control signal. The air conditioner 3 includes a signal receiving part 32 receiving the control signal from the centralized control device 2, a control part 31 controlling the operation mechanism of the air conditioner 3 in accordance with the control information added to a part other than the empty bit in the control signal, and a control signal transmitting part 33 transmitting the received control signal to the remote controller 4 connected to the air conditioner 3. COPYRIGHT: (C)2011,JPO&amp;INPIT</description><language>eng</language><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING ; BLASTING ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; RANGES ; VENTILATING ; WEAPONS</subject><creationdate>2010</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20101209&amp;DB=EPODOC&amp;CC=JP&amp;NR=2010276316A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20101209&amp;DB=EPODOC&amp;CC=JP&amp;NR=2010276316A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MORIMOTO KUNITAKA</creatorcontrib><creatorcontrib>TSUNODA HISASHI</creatorcontrib><creatorcontrib>HAYASHI MARIO</creatorcontrib><title>AIR CONDITIONING SYSTEM</title><description>PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION: A centralized control device 2 includes a signal transmitting/receiving part 22 transmitting a control signal including control information to an air conditioner, and an information adding part 23 adding control information relative to a remote controller 4 to an empty bit not handled as a bit to which the control information is added in the control signal. The air conditioner 3 includes a signal receiving part 32 receiving the control signal from the centralized control device 2, a control part 31 controlling the operation mechanism of the air conditioner 3 in accordance with the control information added to a part other than the empty bit in the control signal, and a control signal transmitting part 33 transmitting the received control signal to the remote controller 4 connected to the air conditioner 3. COPYRIGHT: (C)2011,JPO&amp;INPIT</description><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</subject><subject>BLASTING</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>RANGES</subject><subject>VENTILATING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2010</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBB39AxScPb3c_EM8fT38_RzVwiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhgZG5mbGhmaOxkQpAgAZsR_w</recordid><startdate>20101209</startdate><enddate>20101209</enddate><creator>MORIMOTO KUNITAKA</creator><creator>TSUNODA HISASHI</creator><creator>HAYASHI MARIO</creator><scope>EVB</scope></search><sort><creationdate>20101209</creationdate><title>AIR CONDITIONING SYSTEM</title><author>MORIMOTO KUNITAKA ; TSUNODA HISASHI ; HAYASHI MARIO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2010276316A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2010</creationdate><topic>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</topic><topic>BLASTING</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>RANGES</topic><topic>VENTILATING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MORIMOTO KUNITAKA</creatorcontrib><creatorcontrib>TSUNODA HISASHI</creatorcontrib><creatorcontrib>HAYASHI MARIO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MORIMOTO KUNITAKA</au><au>TSUNODA HISASHI</au><au>HAYASHI MARIO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>AIR CONDITIONING SYSTEM</title><date>2010-12-09</date><risdate>2010</risdate><abstract>PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION: A centralized control device 2 includes a signal transmitting/receiving part 22 transmitting a control signal including control information to an air conditioner, and an information adding part 23 adding control information relative to a remote controller 4 to an empty bit not handled as a bit to which the control information is added in the control signal. The air conditioner 3 includes a signal receiving part 32 receiving the control signal from the centralized control device 2, a control part 31 controlling the operation mechanism of the air conditioner 3 in accordance with the control information added to a part other than the empty bit in the control signal, and a control signal transmitting part 33 transmitting the received control signal to the remote controller 4 connected to the air conditioner 3. COPYRIGHT: (C)2011,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2010276316A
source esp@cenet
subjects AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING
BLASTING
HEATING
LIGHTING
MECHANICAL ENGINEERING
RANGES
VENTILATING
WEAPONS
title AIR CONDITIONING SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T07%3A17%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MORIMOTO%20KUNITAKA&rft.date=2010-12-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2010276316A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true