AIR CONDITIONING SYSTEM

PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION:...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MORIMOTO KUNITAKA, TSUNODA HISASHI, HAYASHI MARIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To effectively use an existing system structure by enabling the combined use of equipment corresponding to new operation control and equipment not corresponding to the new operation control even if the new operation control such as daylight saving time is introduced. SOLUTION: A centralized control device 2 includes a signal transmitting/receiving part 22 transmitting a control signal including control information to an air conditioner, and an information adding part 23 adding control information relative to a remote controller 4 to an empty bit not handled as a bit to which the control information is added in the control signal. The air conditioner 3 includes a signal receiving part 32 receiving the control signal from the centralized control device 2, a control part 31 controlling the operation mechanism of the air conditioner 3 in accordance with the control information added to a part other than the empty bit in the control signal, and a control signal transmitting part 33 transmitting the received control signal to the remote controller 4 connected to the air conditioner 3. COPYRIGHT: (C)2011,JPO&INPIT