ACCIDENT RECOVERY SUPPORT SYSTEM

PROBLEM TO BE SOLVED: To the solve the following problem: an operator may induce a human error because it takes much time for switching a control screen to completely recover from a power failure accident in a wide range resulting from an accident of a high-order substation and it is necessary to de...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KAWAMOTO SHOJI, UCHIUMI TAKUYA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KAWAMOTO SHOJI
UCHIUMI TAKUYA
description PROBLEM TO BE SOLVED: To the solve the following problem: an operator may induce a human error because it takes much time for switching a control screen to completely recover from a power failure accident in a wide range resulting from an accident of a high-order substation and it is necessary to determine whether or not trial charging is to be performed in a section of power failure. SOLUTION: The power failure range is recognized from an accident occurrence point in a power system and the order of recovery steps to be taken for accident recovery is determined. In addition, a recovery operation screen of an electric power station according to the priority is transiently called out to assist accident recovery by the operator, thereby shortening the recovery time and improving a recovery level to reduce a burden on the operator and prevent a human error. COPYRIGHT: (C)2010,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2010028964A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2010028964A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2010028964A3</originalsourceid><addsrcrecordid>eNrjZFBwdHb2dHH1C1EIcnX2D3MNilQIDg0I8A8KUQiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhgYGRhaWZiaOxkQpAgBVYyKn</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>ACCIDENT RECOVERY SUPPORT SYSTEM</title><source>esp@cenet</source><creator>KAWAMOTO SHOJI ; UCHIUMI TAKUYA</creator><creatorcontrib>KAWAMOTO SHOJI ; UCHIUMI TAKUYA</creatorcontrib><description>PROBLEM TO BE SOLVED: To the solve the following problem: an operator may induce a human error because it takes much time for switching a control screen to completely recover from a power failure accident in a wide range resulting from an accident of a high-order substation and it is necessary to determine whether or not trial charging is to be performed in a section of power failure. SOLUTION: The power failure range is recognized from an accident occurrence point in a power system and the order of recovery steps to be taken for accident recovery is determined. In addition, a recovery operation screen of an electric power station according to the priority is transiently called out to assist accident recovery by the operator, thereby shortening the recovery time and improving a recovery level to reduce a burden on the operator and prevent a human error. COPYRIGHT: (C)2010,JPO&amp;INPIT</description><language>eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC ; GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS ; GENERATION ; INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ONOTHER TECHNOLOGY AREAS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORKOPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FORIMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION,DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS ; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS</subject><creationdate>2010</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20100204&amp;DB=EPODOC&amp;CC=JP&amp;NR=2010028964A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20100204&amp;DB=EPODOC&amp;CC=JP&amp;NR=2010028964A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KAWAMOTO SHOJI</creatorcontrib><creatorcontrib>UCHIUMI TAKUYA</creatorcontrib><title>ACCIDENT RECOVERY SUPPORT SYSTEM</title><description>PROBLEM TO BE SOLVED: To the solve the following problem: an operator may induce a human error because it takes much time for switching a control screen to completely recover from a power failure accident in a wide range resulting from an accident of a high-order substation and it is necessary to determine whether or not trial charging is to be performed in a section of power failure. SOLUTION: The power failure range is recognized from an accident occurrence point in a power system and the order of recovery steps to be taken for accident recovery is determined. In addition, a recovery operation screen of an electric power station according to the priority is transiently called out to assist accident recovery by the operator, thereby shortening the recovery time and improving a recovery level to reduce a burden on the operator and prevent a human error. COPYRIGHT: (C)2010,JPO&amp;INPIT</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC</subject><subject>GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS</subject><subject>GENERATION</subject><subject>INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ONOTHER TECHNOLOGY AREAS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORKOPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FORIMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION,DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS</subject><subject>TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2010</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBwdHb2dHH1C1EIcnX2D3MNilQIDg0I8A8KUQiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhgYGRhaWZiaOxkQpAgBVYyKn</recordid><startdate>20100204</startdate><enddate>20100204</enddate><creator>KAWAMOTO SHOJI</creator><creator>UCHIUMI TAKUYA</creator><scope>EVB</scope></search><sort><creationdate>20100204</creationdate><title>ACCIDENT RECOVERY SUPPORT SYSTEM</title><author>KAWAMOTO SHOJI ; UCHIUMI TAKUYA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2010028964A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2010</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC</topic><topic>GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS</topic><topic>GENERATION</topic><topic>INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ONOTHER TECHNOLOGY AREAS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORKOPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FORIMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION,DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS</topic><topic>TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS</topic><toplevel>online_resources</toplevel><creatorcontrib>KAWAMOTO SHOJI</creatorcontrib><creatorcontrib>UCHIUMI TAKUYA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KAWAMOTO SHOJI</au><au>UCHIUMI TAKUYA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>ACCIDENT RECOVERY SUPPORT SYSTEM</title><date>2010-02-04</date><risdate>2010</risdate><abstract>PROBLEM TO BE SOLVED: To the solve the following problem: an operator may induce a human error because it takes much time for switching a control screen to completely recover from a power failure accident in a wide range resulting from an accident of a high-order substation and it is necessary to determine whether or not trial charging is to be performed in a section of power failure. SOLUTION: The power failure range is recognized from an accident occurrence point in a power system and the order of recovery steps to be taken for accident recovery is determined. In addition, a recovery operation screen of an electric power station according to the priority is transiently called out to assist accident recovery by the operator, thereby shortening the recovery time and improving a recovery level to reduce a burden on the operator and prevent a human error. COPYRIGHT: (C)2010,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2010028964A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS
GENERATION
INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ONOTHER TECHNOLOGY AREAS
SYSTEMS FOR STORING ELECTRIC ENERGY
SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORKOPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FORIMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION,DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
title ACCIDENT RECOVERY SUPPORT SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T16%3A35%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KAWAMOTO%20SHOJI&rft.date=2010-02-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2010028964A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true