DEMOLITION METHOD FOR MULTISTORIED BUILDING

PROBLEM TO BE SOLVED: To provide a jackdown type demolition method for a multistoried building, which maintains a horizontal force applied to a jack small. SOLUTION: In a contraction step, the jacks 10 are interposed among all columns P1-Pm on the specific lower story Fv of the multistoried building...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOBAYASHI MINORU, MORISHIMA YOICHI, KAWAI YUKI, OTSUKA SHIGEMITSU, KAWAKAMI TOSHIO, ITO HITOSHI, KOJIMA KAZUO, MACHISUJI KUNIHIKO, YOSHIKAWA TAIICHIRO, MIYAZAKI YASUNOBU, MIZUTANI AKIRA, ASAOKA SHIGERU, OGIWARA YUKIMASA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a jackdown type demolition method for a multistoried building, which maintains a horizontal force applied to a jack small. SOLUTION: In a contraction step, the jacks 10 are interposed among all columns P1-Pm on the specific lower story Fv of the multistoried building 1 to be demolished; a demolition work story Fd, where a floor beam or a floor board 3 is separated from all the columns P1-Pm of the building 1, is installed on a story F (v+1) directly above the specific lower story Fv; and the jacks 10 among the all the columns P1-Pm are simultaneously contracted. In an extension step, upper portions directly above the jacks are sequentially suspended and cut for extension. In the jackdown type demolition method, the contraction step and the extension one are repeated, so that respective stories Fj (j>d) connected to the columns P1-Pm above the demolition work story Fd can be gradually lowered to sequentially demolish skeletons (the floor beam, the floor board 3 or a wall 4) except the columns P on the respective lowered stories Fj by the demolition work story Fd. Preferably, restraining devices 34 for connecting the floor beam or the floor board 3 with the columns P1-Pm are provided in gaps d between all the columns P1-Pm and the floor beam or the floor board 3 on the demolition work story Fd, respectively. COPYRIGHT: (C)2009,JPO&INPIT