STARTING METHOD FOR SHIELD MACHINE
PROBLEM TO BE SOLVED: To facilitate removal work after temporary excavation by using an intermediate support material in place of a temporary segment at the start of a shield machine, and to facilitate the carrying-in of the segment, the carrying-out of excavated soil, etc. during the temporary exca...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To facilitate removal work after temporary excavation by using an intermediate support material in place of a temporary segment at the start of a shield machine, and to facilitate the carrying-in of the segment, the carrying-out of excavated soil, etc. during the temporary excavation. SOLUTION: After the shield machine 2 is jacked by a base-pushing jack 1, a lower jack 11 of the base-pushing jack 1 is contracted so that a lower intermediate support material 5 can be inserted between the shield machine 2 and the base-pushing jack 1. Upper jacks 12 and 13 of the base-pushing jack 1 are contracted so that an upward-opened upper intermediate support material 6 can be inserted between the shield machine 2 and the base-pushing jack 1. Subsequently, the shield machine 2 is jacked by the base-pushing jack 1 via the upper and lower intermediate support materials 6 and 5. COPYRIGHT: (C)2009,JPO&INPIT |
---|