FLOATING PREVENTION CONSTRUCTION FOR UNDERGROUND STRUCTURE
PROBLEM TO BE SOLVED: To implement a floating prevention construction for an underground structure, which can prevent buoyancy applied to the structure and deformation of the same accompanying the buoyancy. SOLUTION: A peripheral wall of the underground structure has bored therein a plurality of rec...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To implement a floating prevention construction for an underground structure, which can prevent buoyancy applied to the structure and deformation of the same accompanying the buoyancy. SOLUTION: A peripheral wall of the underground structure has bored therein a plurality of recesses and through holes communicating with the same, and an inner pipe is arranged in each recess and the through hole communicating with the same, followed by attaching a water collecting pipe to a front end of the inner pipe. Further the inner pipe is fixed to the structure via a water cutoff material and an outer pipe, and the recess is sealed with a water cutoff band, followed by setting a drain pressure adjusting device at a rear end of the inner pipe. COPYRIGHT: (C)2009,JPO&INPIT |
---|