METHOD FOR CONSTRUCTING VERTICAL SHAFT TEMPORARY WALL
PROBLEM TO BE SOLVED: To provide a method for constructing a vertical shaft temporary wall capable of setting pile members in a building position of an excavation pit with an erected attitude to form an area of a fixed shape allowing the passing of a shield machine between the pile members. SOLUTION...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a method for constructing a vertical shaft temporary wall capable of setting pile members in a building position of an excavation pit with an erected attitude to form an area of a fixed shape allowing the passing of a shield machine between the pile members. SOLUTION: The method for constructing a vertical shaft temporary wall comprises a pile member building step of raising a building pile member 10A with a second pile member 17 laid down, and building the building pile member 10A in an excavation pit 13 while removing a support plate 18 from the first and the second pile members 16 and 17; a joint pile member building step of building a joint pile member 24 from above the first pile member 16 after building the building pile member 10A in a predetermined position in the pile member building step; and a steel wire drawing step of separating first to fourth steel wires 19, 20, 21 and 22 from a steel wire first support member 23 after curing soil mortar 14, and drawing the steel wires 19, 20, 21 and 22 from the excavation pit 13. COPYRIGHT: (C)2009,JPO&INPIT |
---|