CONSTRUCTION METHOD FOR PREVENTING LIFT OF UNDERGROUND STRUCTURE

PROBLEM TO BE SOLVED: To provide a construction method for preventing the lift of an underground structure, which can make an occupied area of a road small, and which can reduce construction costs. SOLUTION: This construction method for preventing the lift of the underground structure is characteriz...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: OKUBO YASUHIRO, KONISHI YASUHIKO, TAKEUCHI MIKIO, IIDA TSUTOMU, KURUMADA YOSHINORI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a construction method for preventing the lift of an underground structure, which can make an occupied area of a road small, and which can reduce construction costs. SOLUTION: This construction method for preventing the lift of the underground structure is characterized in that improved ground is formed by injecting a chemical solution into ground 9 on the downside of the bottom of the underground structure 6. The injection of the chemical solution into the sand ground 9 is performed by installing an injection pipe 11 with a check valve in an injection hole 10 which is drilled in the bottom 8 of the underground structure 6 from the inside. COPYRIGHT: (C)2008,JPO&INPIT