CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE, SOIL CEMENT WALL, SOIL CEMENT WALL PILE, UNDERGROUND STRUCTURE, FOUNDATION STRUCTURE OF BUILDING, AND GROUND EXCAVATING EQUIPMENT
PROBLEM TO BE SOLVED: To provide a construction method for an inexpensively manufacturable underground structure with sufficient strength. SOLUTION: Soil cement 13 constitutes at least a part of the soil cement wall 10. The ground is partially drilled and agitated, a grouting liquid composed of a ce...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a construction method for an inexpensively manufacturable underground structure with sufficient strength. SOLUTION: Soil cement 13 constitutes at least a part of the soil cement wall 10. The ground is partially drilled and agitated, a grouting liquid composed of a cement-based material is injected into drilled and agitated target soil, the target soil and the grouting liquid are mixed and agitated, and a mixture of the target soil and the grouting liquid is partially discharged. Thus, the soil cement which constitutes the underground structure is at least partially constructed in situ. COPYRIGHT: (C)2008,JPO&INPIT |
---|