PIECEWORK MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | KOMOTO HIROSHI YAMAWAKI DAISUKE MASUDA TOYOHIKO KUBO YOSHIFUMI |
description | PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007328434A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007328434A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007328434A3</originalsourceid><addsrcrecordid>eNrjZJAO8HR1dg33D_JW8HX0c3R39XX1C1EIjgwOcfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgbmxkYWJsYmjsZEKQIAoichIw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PIECEWORK MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</creator><creatorcontrib>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; PHYSICS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20071220&DB=EPODOC&CC=JP&NR=2007328434A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20071220&DB=EPODOC&CC=JP&NR=2007328434A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KOMOTO HIROSHI</creatorcontrib><creatorcontrib>YAMAWAKI DAISUKE</creatorcontrib><creatorcontrib>MASUDA TOYOHIKO</creatorcontrib><creatorcontrib>KUBO YOSHIFUMI</creatorcontrib><title>PIECEWORK MANAGEMENT SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>PHYSICS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAO8HR1dg33D_JW8HX0c3R39XX1C1EIjgwOcfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgbmxkYWJsYmjsZEKQIAoichIw</recordid><startdate>20071220</startdate><enddate>20071220</enddate><creator>KOMOTO HIROSHI</creator><creator>YAMAWAKI DAISUKE</creator><creator>MASUDA TOYOHIKO</creator><creator>KUBO YOSHIFUMI</creator><scope>EVB</scope></search><sort><creationdate>20071220</creationdate><title>PIECEWORK MANAGEMENT SYSTEM</title><author>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007328434A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>PHYSICS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>KOMOTO HIROSHI</creatorcontrib><creatorcontrib>YAMAWAKI DAISUKE</creatorcontrib><creatorcontrib>MASUDA TOYOHIKO</creatorcontrib><creatorcontrib>KUBO YOSHIFUMI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KOMOTO HIROSHI</au><au>YAMAWAKI DAISUKE</au><au>MASUDA TOYOHIKO</au><au>KUBO YOSHIFUMI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PIECEWORK MANAGEMENT SYSTEM</title><date>2007-12-20</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2007328434A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE PHYSICS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | PIECEWORK MANAGEMENT SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T17%3A18%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KOMOTO%20HIROSHI&rft.date=2007-12-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007328434A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |