PIECEWORK MANAGEMENT SYSTEM

PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOMOTO HIROSHI, YAMAWAKI DAISUKE, MASUDA TOYOHIKO, KUBO YOSHIFUMI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KOMOTO HIROSHI
YAMAWAKI DAISUKE
MASUDA TOYOHIKO
KUBO YOSHIFUMI
description PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007328434A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007328434A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007328434A3</originalsourceid><addsrcrecordid>eNrjZJAO8HR1dg33D_JW8HX0c3R39XX1C1EIjgwOcfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgbmxkYWJsYmjsZEKQIAoichIw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PIECEWORK MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</creator><creatorcontrib>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&amp;INPIT</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; PHYSICS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071220&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007328434A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071220&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007328434A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KOMOTO HIROSHI</creatorcontrib><creatorcontrib>YAMAWAKI DAISUKE</creatorcontrib><creatorcontrib>MASUDA TOYOHIKO</creatorcontrib><creatorcontrib>KUBO YOSHIFUMI</creatorcontrib><title>PIECEWORK MANAGEMENT SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&amp;INPIT</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>PHYSICS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAO8HR1dg33D_JW8HX0c3R39XX1C1EIjgwOcfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgbmxkYWJsYmjsZEKQIAoichIw</recordid><startdate>20071220</startdate><enddate>20071220</enddate><creator>KOMOTO HIROSHI</creator><creator>YAMAWAKI DAISUKE</creator><creator>MASUDA TOYOHIKO</creator><creator>KUBO YOSHIFUMI</creator><scope>EVB</scope></search><sort><creationdate>20071220</creationdate><title>PIECEWORK MANAGEMENT SYSTEM</title><author>KOMOTO HIROSHI ; YAMAWAKI DAISUKE ; MASUDA TOYOHIKO ; KUBO YOSHIFUMI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007328434A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>PHYSICS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>KOMOTO HIROSHI</creatorcontrib><creatorcontrib>YAMAWAKI DAISUKE</creatorcontrib><creatorcontrib>MASUDA TOYOHIKO</creatorcontrib><creatorcontrib>KUBO YOSHIFUMI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KOMOTO HIROSHI</au><au>YAMAWAKI DAISUKE</au><au>MASUDA TOYOHIKO</au><au>KUBO YOSHIFUMI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PIECEWORK MANAGEMENT SYSTEM</title><date>2007-12-20</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2007328434A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
PHYSICS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title PIECEWORK MANAGEMENT SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T17%3A18%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KOMOTO%20HIROSHI&rft.date=2007-12-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007328434A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true