PIECEWORK MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a piecework management system capable of obtaining highly objective piecework information for increasing the commonality of the recognition of both a constructor side and a manager side to an output. SOLUTION: In the piecework management system used for managing the progress status of construction to be progressed by the constructor side, a manager side provids a CAD model-including data D3 including a CAD model with respect to the construction of an piecework management object to the constructor side, and the constructor side prepares a CAD model base construction progress status data D17 by overlapping a construction progress status data D16 with respect to the actual progress status of the construction on the CAD model including data, then the constructor side can apply the acceptance of the construction progress status to the manager side by using the CAD model base construction progress status data. COPYRIGHT: (C)2008,JPO&INPIT |
---|