REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE

PROBLEM TO BE SOLVED: To provide a reinforcement member and a pipe line insertion method into an existing pipe line capable of improving workability. SOLUTION: In the pipe line insertion method into an existing pipe line, the reinforcement member 10 is attached to a pipe line member 26, and the butt...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HARADA TAKATOMO, SAKAMOTO HIROAKI, NAKAMURA RYOICHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HARADA TAKATOMO
SAKAMOTO HIROAKI
NAKAMURA RYOICHIRO
description PROBLEM TO BE SOLVED: To provide a reinforcement member and a pipe line insertion method into an existing pipe line capable of improving workability. SOLUTION: In the pipe line insertion method into an existing pipe line, the reinforcement member 10 is attached to a pipe line member 26, and the butt fusion of the end of the pipe line member 26 and the end of the other pipe line member 26 is carried out to form a pipe line 12. Beads formed by butt-welding are removed, and then, the reinforcement member 10 is promptly moved in a pipe axial direction to a position across a fusion position 32. Projections 28 of the reinforcement member 10 are engaged with the outer circumference face of the pipe line member 26 to fix the reinforcement member 10 to the pipe line 12. The pipe line 12 inserted into the existing pipe line 14 in a state that a lower side flange 18 contacts with the inner face of the existing pipe line 14. By the reinforcement member 10, a cooling time is shortened, and as a result, a construction time is shortened. The traction of the pipe line 12 can be reduced by the lower side flange 18, and workability is improved. COPYRIGHT: (C)2007,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007218392A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007218392A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007218392A3</originalsourceid><addsrcrecordid>eNrjZPAOcvX0c_MPcnb1dfULUfB19XVyDVJw9HNRCPAMcFXw8fRzVfD0C3YNCvH09wNKh3j4uwAFQvwVXCM8g0M8_dwRCnkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBgbmRoYWxpZGjMVGKAOLrLhM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE</title><source>esp@cenet</source><creator>HARADA TAKATOMO ; SAKAMOTO HIROAKI ; NAKAMURA RYOICHIRO</creator><creatorcontrib>HARADA TAKATOMO ; SAKAMOTO HIROAKI ; NAKAMURA RYOICHIRO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a reinforcement member and a pipe line insertion method into an existing pipe line capable of improving workability. SOLUTION: In the pipe line insertion method into an existing pipe line, the reinforcement member 10 is attached to a pipe line member 26, and the butt fusion of the end of the pipe line member 26 and the end of the other pipe line member 26 is carried out to form a pipe line 12. Beads formed by butt-welding are removed, and then, the reinforcement member 10 is promptly moved in a pipe axial direction to a position across a fusion position 32. Projections 28 of the reinforcement member 10 are engaged with the outer circumference face of the pipe line member 26 to fix the reinforcement member 10 to the pipe line 12. The pipe line 12 inserted into the existing pipe line 14 in a state that a lower side flange 18 contacts with the inner face of the existing pipe line 14. By the reinforcement member 10, a cooling time is shortened, and as a result, a construction time is shortened. The traction of the pipe line 12 can be reduced by the lower side flange 18, and workability is improved. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><language>eng</language><subject>BLASTING ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070830&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007218392A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070830&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007218392A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HARADA TAKATOMO</creatorcontrib><creatorcontrib>SAKAMOTO HIROAKI</creatorcontrib><creatorcontrib>NAKAMURA RYOICHIRO</creatorcontrib><title>REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE</title><description>PROBLEM TO BE SOLVED: To provide a reinforcement member and a pipe line insertion method into an existing pipe line capable of improving workability. SOLUTION: In the pipe line insertion method into an existing pipe line, the reinforcement member 10 is attached to a pipe line member 26, and the butt fusion of the end of the pipe line member 26 and the end of the other pipe line member 26 is carried out to form a pipe line 12. Beads formed by butt-welding are removed, and then, the reinforcement member 10 is promptly moved in a pipe axial direction to a position across a fusion position 32. Projections 28 of the reinforcement member 10 are engaged with the outer circumference face of the pipe line member 26 to fix the reinforcement member 10 to the pipe line 12. The pipe line 12 inserted into the existing pipe line 14 in a state that a lower side flange 18 contacts with the inner face of the existing pipe line 14. By the reinforcement member 10, a cooling time is shortened, and as a result, a construction time is shortened. The traction of the pipe line 12 can be reduced by the lower side flange 18, and workability is improved. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><subject>BLASTING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAOcvX0c_MPcnb1dfULUfB19XVyDVJw9HNRCPAMcFXw8fRzVfD0C3YNCvH09wNKh3j4uwAFQvwVXCM8g0M8_dwRCnkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBgbmRoYWxpZGjMVGKAOLrLhM</recordid><startdate>20070830</startdate><enddate>20070830</enddate><creator>HARADA TAKATOMO</creator><creator>SAKAMOTO HIROAKI</creator><creator>NAKAMURA RYOICHIRO</creator><scope>EVB</scope></search><sort><creationdate>20070830</creationdate><title>REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE</title><author>HARADA TAKATOMO ; SAKAMOTO HIROAKI ; NAKAMURA RYOICHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007218392A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>BLASTING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>HARADA TAKATOMO</creatorcontrib><creatorcontrib>SAKAMOTO HIROAKI</creatorcontrib><creatorcontrib>NAKAMURA RYOICHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HARADA TAKATOMO</au><au>SAKAMOTO HIROAKI</au><au>NAKAMURA RYOICHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE</title><date>2007-08-30</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a reinforcement member and a pipe line insertion method into an existing pipe line capable of improving workability. SOLUTION: In the pipe line insertion method into an existing pipe line, the reinforcement member 10 is attached to a pipe line member 26, and the butt fusion of the end of the pipe line member 26 and the end of the other pipe line member 26 is carried out to form a pipe line 12. Beads formed by butt-welding are removed, and then, the reinforcement member 10 is promptly moved in a pipe axial direction to a position across a fusion position 32. Projections 28 of the reinforcement member 10 are engaged with the outer circumference face of the pipe line member 26 to fix the reinforcement member 10 to the pipe line 12. The pipe line 12 inserted into the existing pipe line 14 in a state that a lower side flange 18 contacts with the inner face of the existing pipe line 14. By the reinforcement member 10, a cooling time is shortened, and as a result, a construction time is shortened. The traction of the pipe line 12 can be reduced by the lower side flange 18, and workability is improved. COPYRIGHT: (C)2007,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2007218392A
source esp@cenet
subjects BLASTING
ENGINEERING ELEMENTS AND UNITS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WEAPONS
title REINFORCEMENT MEMBER AND PIPE LINE INSERTION METHOD INTO EXISTING PIPE LINE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T01%3A37%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HARADA%20TAKATOMO&rft.date=2007-08-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007218392A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true