RAILWAY TRAFFIC CONTROL SYSTEM
PROBLEM TO BE SOLVED: To solve communication problems among commanders when terminals are distributed in vehicle crew rooms as well as in the operation command rooms because a device for transmitting a schedule change among a plurality of terminals has only one operation plan corrected in common in...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To solve communication problems among commanders when terminals are distributed in vehicle crew rooms as well as in the operation command rooms because a device for transmitting a schedule change among a plurality of terminals has only one operation plan corrected in common in a conventional train operation control system. SOLUTION: This system includes a terminal control device 5 having an input device 6B for inputting a schedule change plan, a display device 6A for displaying a schedule change plan 6H, a communicating device 5H for performing communication between schedule change input terminals 6 having a communication device 6J for communicating with a terminal control device 5, an operation schedule change device 5M for changing the operation plan, an influence terminal specifying device 5K for determining the schedule change input terminal 6 for transmitting a schedule change plan input by the schedule change input terminal 6 referring to data 5E regarding a range in charge and authority in charge determined corresponding to the schedule change input terminal 6 registered in advance. COPYRIGHT: (C)2007,JPO&INPIT |
---|