MOUNTING METAL FITTING FOR SC STRUCTURE

PROBLEM TO BE SOLVED: To conquer the problem such as increasing work time and manhours in an SC structure having a mounting metal fitting on a surface of a steel plate. SOLUTION: A through-hole 2 is arranged in the steel plate 1 constituting the SC structure, and by inserting a bolt 5 into this thro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FUKUDA TAKETO, NOCHIDA KOICHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To conquer the problem such as increasing work time and manhours in an SC structure having a mounting metal fitting on a surface of a steel plate. SOLUTION: A through-hole 2 is arranged in the steel plate 1 constituting the SC structure, and by inserting a bolt 5 into this through-hole 2, a bar-shaped steel material 3 of cutting a female screw hole is installed on one surface of the steel plate 1, and a steel plate 4 being a base board of the mounting metal fitting is installed on the other surface. After putting the bar-shaped steel material 3 and the steel plate 4 in a state of being installed on the steel plate 1 by the bolt 5, the steel plate 1 is carried in a construction site, and concrete is placed so that the bar-shaped steel material 3 is formed in the shape of being embedded in a concrete skeleton 12, and thus, even if the bar-shaped steel material 3 is not welded to the steel plate 1, required strength can be provided. COPYRIGHT: (C)2007,JPO&INPIT