CONSTRUCTION METHOD OF SAND REMOVAL FACILITY USING TEMPORARY DRAINAGE CHANNEL IN BANK

PROBLEM TO BE SOLVED: To provide a construction method capable of relatively inexpensively and efficiently constructing a sand removal facility for discharging sediment in a water reservoir of a dam to the downstream side. SOLUTION: This construction method includes a process of removing concrete fr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HAYASHI TOSHIKATSU, FUJITA TSUKASA, HABUKAWA SHINJI, ITO KOICHI, TAKEBAYASHI SEIZO, TOYAMA MASAYUKI, KUDO HISAO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a construction method capable of relatively inexpensively and efficiently constructing a sand removal facility for discharging sediment in a water reservoir of a dam to the downstream side. SOLUTION: This construction method includes a process of removing concrete from a temporary drainage channel arranged in a bank body as a temporary drainage channel when constructing the dam and blocked up by filling the concrete after constructing the dam, a process of forming an opening on the upstream side of the temporary drainage channel filled with the concrete, a process of forming a work space by enclosing the upstream side opening periphery before the process of forming the upstream side opening, a process of forming a discharge passage for passing the sediment through a tunnel of removing the concrete, and a process of arranging a means for opening and closing the discharge passage for adjusting a discharge quantity of water including the sediment. COPYRIGHT: (C)2007,JPO&INPIT