TUNNEL SEGMENT
PROBLEM TO BE SOLVED: To prevent an explosion of a filling concrete layer, when a fire is caused in a tunnel, without particularly arranging a fire resistant covering material. SOLUTION: This tunnel segment is constituted so that its filled filling concrete layer 5 side can be arranged toward the tu...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To prevent an explosion of a filling concrete layer, when a fire is caused in a tunnel, without particularly arranging a fire resistant covering material. SOLUTION: This tunnel segment is constituted so that its filled filling concrete layer 5 side can be arranged toward the tunnel inside by filling concrete 4 inside a box-shaped metallic casing 3. Among the filling concrete layer, the segment inner surface 9 side turned to the tunnel inside in at least an arranging state, is constituted of fire resistant concrete 4a blended with synthetic fiber to be melted at 300 °C or less. COPYRIGHT: (C)2007,JPO&INPIT |
---|