CONSTRUCTION OF SMALL-SCALE PIT USING SIMPLE LINING EARTH RETAINING MATERIAL
PROBLEM TO BE SOLVED: To reduce cost by continuously performing extraction and jacking, due to increasing cost since a construction quantity per one day is limited by receiving influence on a work kind quick in a construction speed by a slow work kind, when continuously performing work different in...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To reduce cost by continuously performing extraction and jacking, due to increasing cost since a construction quantity per one day is limited by receiving influence on a work kind quick in a construction speed by a slow work kind, when continuously performing work different in the construction speed such as civil engineering work, towing, jacking, the connection of a water supply pipe and backfilling in a day, when laying a supply pipe. SOLUTION: When continuously performing the extraction and the jacking of the supply pipe, a pit is required to be put in an already excavated state. Thus, the pit is constructed in advance by using a simple lining earth retaining material realized from a combination of a lining material and an earth retaining material capable of preventing deformation and collapse by covering the excavation surface peripheral edge ground with a steel plate. COPYRIGHT: (C)2006,JPO&NCIPI |
---|