CONSTRUCTION METHOD FOR OVERHANG SLAB OF VIADUCT AND PRECAST CONCRETE BOARD FOR OVERHANG SLAB
PROBLEM TO BE SOLVED: To provide a construction method for an overhang slab capable of performing all operations on the slab and a precast concrete board for overhang slab. SOLUTION: In this precast concrete board 1 for the overhang slab of a viaduct, a projected part 3 for joining is formed on a co...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a construction method for an overhang slab capable of performing all operations on the slab and a precast concrete board for overhang slab. SOLUTION: In this precast concrete board 1 for the overhang slab of a viaduct, a projected part 3 for joining is formed on a concrete board 2 from which truss streaks are projected, and joint devices 5 are fitted to mounting rails 9 buried in the concrete board 2. COPYRIGHT: (C)2005,JPO&NCIPI |
---|