CONSTRUCTION METHOD FOR TUNNEL

PROBLEM TO BE SOLVED: To reduce occurrence of crack in a lining concrete layer of a tunnel. SOLUTION: In this construction method for the tunnel, a tunnel hole 2 is formed, a mortar layer or a concrete layer (a concrete filled layer 10 or a sprayed concrete layer 4) is provided on an inner face 3 of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: IRIE MASAAKI, KAJI SHIGEHITO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To reduce occurrence of crack in a lining concrete layer of a tunnel. SOLUTION: In this construction method for the tunnel, a tunnel hole 2 is formed, a mortar layer or a concrete layer (a concrete filled layer 10 or a sprayed concrete layer 4) is provided on an inner face 3 of the tunnel hole 2, a cement crystal proliferator containing concrete layer 12 containing cement crystal proliferator 12A is provided on an inner face 11 of the mortar layer or the concrete layer, an inner face 13 of the cement crystal proliferator containing concrete layer 12 is formed into a smooth face 13a, and the lining concrete layer 14 is provided on this smooth face 13a. COPYRIGHT: (C)2005,JPO&NCIPI