BRIDGE, BRIDGE INSTALLING METHOD AND DECORATIVE SHEET USED FOR THIS BRIDGE
PROBLEM TO BE SOLVED: To enhance a commodity value without impairing an aesthetic feeling as a building, by safely performing bridge installing work, while minimizing traffic regulation when installing a bridge. SOLUTION: This bridge has a main beam 1, a scaffold A when installing a floor member on...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To enhance a commodity value without impairing an aesthetic feeling as a building, by safely performing bridge installing work, while minimizing traffic regulation when installing a bridge. SOLUTION: This bridge has a main beam 1, a scaffold A when installing a floor member on the main beam 1, and a protective work means 3 for constituting a protective work B. The protective work means 3 has a body plate part 13 vertically rotatably installed in main beam lateral both sided parts of the floor member 2 lower position when installing the floor member on the main beam 1, and becoming an upward inclined shape in the outside end direction of the floor member 2, and a rising plate part 23 raised and formed from the tip of the body plate part 13. The floor member 2 is installed over the rising plate part 23 and the main beam 1, to be formed as a completed width W. COPYRIGHT: (C)2005,JPO&NCIPI |
---|