STRUCTURE AND CONSTRUCTION METHOD FOR IN-TUNNEL BUILT-UP PASSAGE FOR OBSERVER
PROBLEM TO BE SOLVED: To provide a structural member and a construction method for a built-up passage for an observer, which can shorten a construction period and cut back on a construction cost, by solving the problem that the construction period cannot be reduced because the construction of the in...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a structural member and a construction method for a built-up passage for an observer, which can shorten a construction period and cut back on a construction cost, by solving the problem that the construction period cannot be reduced because the construction of the in-tunnel passage for the observer requires many processes and other works cannot be started until the completion of curing of concrete. SOLUTION: A steel guard fence (guard rail) for use in current road construction is effectively utilized, and the in-tunnel passage for the observer is constructed as a built-up type, so that the construction period of in-tunnel construction work can be shortened. COPYRIGHT: (C)2005,JPO&NCIPI |
---|