STRUCTURE AND CONSTRUCTION METHOD FOR IN-TUNNEL BUILT-UP PASSAGE FOR OBSERVER

PROBLEM TO BE SOLVED: To provide a structural member and a construction method for a built-up passage for an observer, which can shorten a construction period and cut back on a construction cost, by solving the problem that the construction period cannot be reduced because the construction of the in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YOSHII KOICHI, KUBOTA MASAYA, TAKAHASHI TOSHIO, INOUE AKIRA, IWATA MASAHIRO, SAIKI HIDEO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a structural member and a construction method for a built-up passage for an observer, which can shorten a construction period and cut back on a construction cost, by solving the problem that the construction period cannot be reduced because the construction of the in-tunnel passage for the observer requires many processes and other works cannot be started until the completion of curing of concrete. SOLUTION: A steel guard fence (guard rail) for use in current road construction is effectively utilized, and the in-tunnel passage for the observer is constructed as a built-up type, so that the construction period of in-tunnel construction work can be shortened. COPYRIGHT: (C)2005,JPO&NCIPI