TIMING RESTRICTION PRODUCTION DEVICE

PROBLEM TO BE SOLVED: To finish timing restriction without exception in an early stage. SOLUTION: In this timing restriction production device, a target path extraction part 101 extracts all of data transfer paths formed between at least two lower hierarchy blocks included in an upper hierarchy bloc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: TANAKA GENICHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To finish timing restriction without exception in an early stage. SOLUTION: In this timing restriction production device, a target path extraction part 101 extracts all of data transfer paths formed between at least two lower hierarchy blocks included in an upper hierarchy block among data transfer paths that are targets of timing verification from the timing restriction, a net list and a library, as target paths. A target path output part 103 exhibits a target path list 109 wherein a timing exception can be designated, to a user. A timing restriction correction part 104 corrects the timing restriction according to the timing exception designated by the user to produce new timing restriction. COPYRIGHT: (C)2005,JPO&NCIPI